Augsburg, 22.02.19: Together with partner company EXYTRON, Stadtwerke Augsburg (swa) has installed and commissioned the world's first decentralised power-to-gas plant in an existing residential complex. This enables a challenge of the energy transition to be mastered: surplus, regeneratively generated electricity is converted into synthetic natural gas and can thus be stored on site. Combustion then takes place in a commercially available combined heat and power plant and condensing boilers. In this way, over 180 residents in 70 apartments in the residential complex of the Augsburg housing group, which has existed since 1974, are supplied with climate-friendly electricity and heat.