{"id":18065,"date":"2019-06-28T18:51:27","date_gmt":"2019-06-28T18:51:27","guid":{"rendered":"https:\/\/siedlungen.eu\/?post_type=blog&#038;p=18065"},"modified":"2020-05-18T15:49:11","modified_gmt":"2020-05-18T14:49:11","slug":"besichtigung-europas-groesster-holzbausiedlung","status":"publish","type":"blog","link":"https:\/\/sdg21.eu\/en\/blog\/besichtigung-europas-groesster-holzbausiedlung","title":{"rendered":"Tour of Europe's largest timber construction settlement"},"content":{"rendered":"<p><strong>The <a href=\"http:\/\/sdg21.eu\/db\/oekologische-siedlung-im-prinz-eugen-park\">Ecological model settlement in Prinz Eugen Park<\/a> in Munich, currently the largest contiguous timber housing estate in Europe, was presented.<\/strong><\/p>\n<figure id=\"attachment_16891\" aria-describedby=\"caption-attachment-16891\" style=\"width: 300px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-16891 size-medium\" src=\"http:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925-300x200.jpg 300w, https:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925-560x373.jpg 560w, https:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925-1280x853.jpg 1280w, https:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925-250x167.jpg 250w, https:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925-768x512.jpg 768w, https:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925-1536x1024.jpg 1536w, https:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925-2048x1365.jpg 2048w, https:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925-1320x880.jpg 1320w, https:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925-160x107.jpg 160w, https:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925-1024x683.jpg 1024w, https:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925-144x96.jpg 144w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-16891\" class=\"wp-caption-text\">Photo: Patricia Lucas<\/figcaption><\/figure>\n<p>The Holzbaunetzwerk M\u00fcnchen organized a guided tour through the ecological model settlement in Prinz Eugen Park in Munich on 24.05.2019. In 2009, on the initiative of the Green Party, the City Council of the City of Munich decided to build an ecological model settlement with 600 apartments in timber construction in the new district on the site of the former Prinz Eugen barracks in Bogenhausen. Based on the urban design by GSP Architects with Rainer Schmidt Landscape Architects, eight developers, the municipal housing associations GEWOFAG and GWG M\u00fcnchen, building communities and building cooperatives have developed timber construction projects ranging from atrium houses to seven-storey residential buildings. Today, all projects are under construction and some will be completed this year.<\/p>\n<p><!--more-->The Holzbaunetzwerk M\u00fcnchen could welcome about 400 guests. The architects of the model settlement presented their projects to interested visitors, builders, urban planners, timber construction companies, architects, investors and citizens in two parallel guided tours on 24.05.2019 in the course of a tour through the quarter. The various timber construction methods, from pure timber construction to hybrid construction methods with reinforced concrete staircases to reinforced concrete skeleton construction with timber facades, were vividly explained using the projects.<\/p>\n<p>Presented were the projects of the building cooperative WOGENO with the Quartierszentrale by Mr. Florian L\u00fcnstedt from the office Atelier 5 Architekten Bern, the GEWOFAG by Jakub Pakula and Eduard Fischer, Pakula &amp; Fischer Architekten Stuttgart, the GWG M\u00fcnchen by Stefan Rapp, Rapp Architekten Ulm, the building community Team3 by Architekturwerkstatt Vallentin M\u00fcnchen Dorfen, the building community M\u00fcnchen GbR by Sibylle H\u00fcther, H2R and PlanZ Architekten from Munich, the Baugemeinschaft Gemeinsam Gr\u00f6\u00dfer II by Markus Borst, agmm Architekten+Stadtplaner Munich with Hable Architekten, the Baugenossenschaft B\u00fcrgerbauverein M\u00fcnchen eG by Markus Lager, Kaden + Lager Architekten Berlin and the Baugemeinschaft Der kleine Prinz by Ulf R\u00f6ssler, dressler mayerhofer r\u00f6ssler architekten und stadtplaner GmbH Munich.<\/p>\n<p>Afterwards, at 6 p.m., a panel discussion with the city councillors Ms. Heide Rieke (SPD), Mr. Herbert Danner (Die Gr\u00fcnen), Ms. Ulrike Klar, (City Director, Department of Urban Planning of the City of Munich) and Ms. Gerda Peter (Managing Director of GWG Munich) on the future of timber construction in Munich rounded off the event. It was discussed how the path taken can become a model for further new building areas, what lessons can be learned from the Ecological Model Settlement and how a promotion of timber construction can be designed for the future planning areas of the Bayerkaserne, the urban extensions in the east and north and the redevelopment area of Neuperlach. To this end, the Holzbaunetzwerk M\u00fcnchen wants to launch the Holzbaustadt M\u00fcnchen 2030 initiative with at least 2030 residential units in timber construction. How it works could be seen in the Prinz Eugenpark on 24.05.2019.<\/p>\n<p>The Holzbaunetzwerk M\u00fcnchen was founded in 2018 by Andreas Lerge (Wood Real Estate GmbH) Thomas Kapfer Architekt and Ulf R\u00f6ssler Architekt (dressler mayerhofer r\u00f6ssler architekten und stadtplaner GmbH). The Holzbaunetzwerk wants to work to connect the stakeholders from politics, administration, planning and business, to engage in the further promotion of timber construction in Munich and to initiate the vision of the timber construction city Munich 2030.<\/p>\n<p>Link Holzbaunetzwerk Munich<br \/>\n<a href=\"https:\/\/www.holzbaunetzwerk.com\" target=\"_blank\" rel=\"noopener noreferrer\">www.holzbaunetzwerk.com<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p><a href=\"http:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-16891 size-medium\" title=\"Photo: Patricia Lucas\" src=\"http:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925-300x200.jpg 300w, https:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925-560x373.jpg 560w, https:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925-1280x853.jpg 1280w, https:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925-250x167.jpg 250w, https:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925-768x512.jpg 768w, https:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925-1536x1024.jpg 1536w, https:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925-2048x1365.jpg 2048w, https:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925-1320x880.jpg 1320w, https:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925-160x107.jpg 160w, https:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925-1024x683.jpg 1024w, https:\/\/sdg21.eu\/wp-content\/uploads\/2019\/05\/DSC_8925-144x96.jpg 144w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a> The ecological model settlement in Prinz Eugen Park in Munich, currently the largest contiguous timber construction settlement in Europe, was presented. The Holzbaunetzwerk M\u00fcnchen organized a guided tour through the ecological model settlement in Prinz Eugen Park in Munich on 24.05.2019. In 2009, on the initiative of the Green Party, the City Council of the City of Munich decided to build an ecological model settlement with 600 apartments in timber construction in the new district on the site of the former Prinz Eugen barracks in Bogenhausen. Based on the urban design by GSP Architects with Rainer Schmidt Landscape Architects, eight developers, the municipal housing associations GEWOFAG and GWG M\u00fcnchen, building communities and building cooperatives have developed timber construction projects ranging from atrium houses to seven-storey residential buildings. Today, all projects are under construction and some will be completed this year.<\/p>","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"template":"","format":"standard","blog-kategorie":[775,763,773],"blog-schlagwort":[],"class_list":{"0":"post-18065","1":"blog","2":"type-blog","3":"status-publish","4":"format-standard","6":"blog-kategorie-holzbau","7":"blog-kategorie-bayern","8":"blog-kategorie-siedlungen","9":"gallery-content-unit","10":"czr-hentry"},"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/sdg21.eu\/en\/wp-json\/wp\/v2\/blog\/18065","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sdg21.eu\/en\/wp-json\/wp\/v2\/blog"}],"about":[{"href":"https:\/\/sdg21.eu\/en\/wp-json\/wp\/v2\/types\/blog"}],"author":[{"embeddable":true,"href":"https:\/\/sdg21.eu\/en\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":0,"href":"https:\/\/sdg21.eu\/en\/wp-json\/wp\/v2\/blog\/18065\/revisions"}],"wp:attachment":[{"href":"https:\/\/sdg21.eu\/en\/wp-json\/wp\/v2\/media?parent=18065"}],"wp:term":[{"taxonomy":"blog-kategorie","embeddable":true,"href":"https:\/\/sdg21.eu\/en\/wp-json\/wp\/v2\/blog-kategorie?post=18065"},{"taxonomy":"blog-schlagwort","embeddable":true,"href":"https:\/\/sdg21.eu\/en\/wp-json\/wp\/v2\/blog-schlagwort?post=18065"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}