{"id":18159,"date":"2017-08-07T13:28:14","date_gmt":"2017-08-07T13:28:14","guid":{"rendered":"https:\/\/siedlungen.eu\/?post_type=blog&#038;p=18159"},"modified":"2020-05-18T15:50:17","modified_gmt":"2020-05-18T14:50:17","slug":"planungen-fuer-erstes-baufeld-der-groessten-holzbausiedlung-in-muenchen-vorgestellt","status":"publish","type":"blog","link":"https:\/\/sdg21.eu\/en\/blog\/planungen-fuer-erstes-baufeld-der-groessten-holzbausiedlung-in-muenchen-vorgestellt","title":{"rendered":"Plans for the first construction site of the largest timber housing estate in Munich presented"},"content":{"rendered":"<p>In the current issue of the timber construction magazine \"Mikado\", the design of the first construction site of Germany's largest timber housing estate is presented: <a href=\"https:\/\/www.mikado-online.de\/wp-content\/\/uploads\/2017\/05\/2017_06_Geschosswohnungsbau_Muenchen.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.mikado-online.de\/wp-content\/\/uploads\/2017\/05\/2017_06_Geschosswohnungsbau_Muenchen.pdf<\/a><\/p>\n<p>In the <a href=\"http:\/\/sdg21.eu\/db\/oekologische-siedlung-im-prinz-eugen-park\">Ecological model settlement in Prinz Eugen Park<\/a> in Munich, a total of more than 600 residential units are to be built in timber or timber hybrid construction. According to the Mikado article, all plots of land for the model housing estate, which is up to seven storeys high, have already been allocated.<\/p>","protected":false},"excerpt":{"rendered":"<p>In the current issue of the timber construction magazine \"Mikado\", the design of the first construction site of Germany's largest timber housing estate is presented: <a href=\"https:\/\/www.mikado-online.de\/wp-content\/\/uploads\/2017\/05\/2017_06_Geschosswohnungsbau_Muenchen.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.mikado-online.de\/wp-content\/\/uploads\/2017\/05\/2017_06_Geschosswohnungsbau_Muenchen.pdf<\/a><\/p>\n<p>According to the Mikado article, all the plots in the model development, which is up to seven storeys high, have already been allocated.<\/p>","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"template":"","format":"standard","blog-kategorie":[775,763,774,773],"blog-schlagwort":[],"class_list":{"0":"post-18159","1":"blog","2":"type-blog","3":"status-publish","4":"format-standard","6":"blog-kategorie-holzbau","7":"blog-kategorie-bayern","8":"blog-kategorie-quartiere","9":"blog-kategorie-siedlungen","10":"gallery-content-unit","11":"czr-hentry"},"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/sdg21.eu\/en\/wp-json\/wp\/v2\/blog\/18159","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sdg21.eu\/en\/wp-json\/wp\/v2\/blog"}],"about":[{"href":"https:\/\/sdg21.eu\/en\/wp-json\/wp\/v2\/types\/blog"}],"author":[{"embeddable":true,"href":"https:\/\/sdg21.eu\/en\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":0,"href":"https:\/\/sdg21.eu\/en\/wp-json\/wp\/v2\/blog\/18159\/revisions"}],"wp:attachment":[{"href":"https:\/\/sdg21.eu\/en\/wp-json\/wp\/v2\/media?parent=18159"}],"wp:term":[{"taxonomy":"blog-kategorie","embeddable":true,"href":"https:\/\/sdg21.eu\/en\/wp-json\/wp\/v2\/blog-kategorie?post=18159"},{"taxonomy":"blog-schlagwort","embeddable":true,"href":"https:\/\/sdg21.eu\/en\/wp-json\/wp\/v2\/blog-schlagwort?post=18159"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}