On the Sustainable Building Rating System (NBB), a new version of fact sheets is to be published shortly. In addition, the new eBNB system for the implementation of the NBB during planning and construction is about to be launched.
6/2014 Swedish housing association awards major timber construction contractSwedish housing association Rikshem Ab has signed a major contract with the northern Swedish timber construction company Lindbäcks Bygg, Piteå, to build 2,000 rental flats across the country over the next five years. The volume of the order is estimated at SEK 2 billion (equivalent to around EUR 220 million). The contract includes an option for a further 500 units. The rental flats are to be built in the country's urban centres, primarily in the capital region and the Öresund region in the south, where there is a housing shortage. Lindbäcks Bygg is a family business that was founded in 1924 as a village sawmill and generated sales of SEK 600 million in 2013 with around 200 employees. Lindbäcks started building industrially prefabricated wooden apartment blocks 20 years ago.
(Source: Holzbau Deutschland-Institut e. V.)
3/2014 large sustainable construction areas in Germany:
Munich Freiham on 350 hectares with residential space for 20,000 and commercial space for 7,500 people. The aim is sustainable urban development that fulfils economic, ecological and social requirements in equal measure
Würzburg Hubland with 95 ha, CO2-neutral and for 4,500 inhabitants
2/2014 Fuel cells: The world's largest fuel cell park has gone into operation in South Korea. The plant was built by the American company Fuelcell Energy in Hwaseong City. With an output of 59 megawatts, the plant converts natural gas into electricity and heat and is said to be particularly efficient. (Bloomberg)
.
Europe's largest ecological neighbourhood is being built in France
A sustainable neighbourhood is to be built on more than 200 hectares for 30,000 private individuals in Montreuil, France. The neighbourhood is part of a new development area covering a total of 892 hectares and is being funded with 3.5 million euros from the NQU initiative (Nouveaux Quartiers Urbains = New Urban Districts).
www.montreuil.fr/grands-projets/les-hauts-de-montreuil
Mayor Michael Grötsch; State Environment Minister Franz Untersteller; Karl-heinz Frings, Managing Director of GBG; Martin in der Beek, Technical Managing Director of rnv; Gregor Kiefer, Head of Construction Management, GBG. Photo: City of Mannheim / Markus Proßwitz
The city is to become cleaner and quieter: Under the heading "blue_village_Franklin", important future topics such as new mobility, energy efficiency, climate-optimised living or smart grids are being tested with the conversion of the former military area FRANKLIN. The SQUARE project, two model houses renovated according to the latest energy standards, and the electromobile bus lines 66 and 67 are part of this master plan. Franz Untersteller MdL, State Minister for the Environment, Climate and Energy Management, visited the two model projects in the new urban quarter on Tuesday, 4 August, as part of his summer tour "Environmental Future".
"With SQUARE, the city of Mannheim and the Mannheim housing association are showing a way to design climate- and energy-optimised living in existing buildings," said the Environment Minister during his visit. "It is impressive to see what has been implemented here in terms of building refurbishment, electromobility and smart grids. And it will be exciting to evaluate the results of this model project and make them usable for other projects."
Lord Mayor Dr. Peter Kurz explains: "With Franklin, an ecological urban quarter for over 9,000 people is being created that will set new standards. Our goal is to consume as little energy as possible throughout the district, to generate as much renewable energy locally as possible and to cause as few emissions as possible. In this context, the SQUARE model project presents two interesting approaches to solutions."
Back in 2014, the model project for energy-efficient building refurbishment SQUARE (smart quarter and urban area reducing emissions) was awarded a prize in the "Klimaschutz mit System" (Climate Protection with a System) competition run by the Baden-Württemberg Ministry of the Environment. The SQUARE project application was prepared by the City of Mannheim's Economic Development Department in cooperation with the Climate Protection Control Centre. Thanks to the award, SQUARE was able to be included in the ERDF funding programme at the time and supported with three million euros. "SQUARE stands for one of the most ambitious projects in the field of GreenTech and climate protection in the city of Mannheim in the past decade. It is one of the pioneering projects developed from the "Blue City Mannheim" strategy concept of the Economic Development Department. The green tech innovation strategy from 2013 is still highly topical and sets the course for climate-neutral mobility and smart grids," emphasizes Mayor Michael Grötsch.
GBG - Mannheimer Wohnungsbaugesellschaft finally successfully implemented the model project on FRANKLIN. The first tenants moved in at the end of 2019. The two almost identical buildings were renovated according to different standards, one building according to the EnEV standard (SQUARE now), the second building with passive house elements according to an EnerPhIT standard (SQUARE next). Technologies such as smart grids, seasonal heat storage using ice storage and intelligent mobility concepts are being tested. The total of 48 rental apartments are spread across 3- to 5-room apartments between 84 and 109 sqm. "We are very excited about the insights we will gain through SQUARE. According to the calculations and simulations, we can achieve a CO2 saving of more than 50 percent in the comparison of the two buildings. In order to be able to save even more CO2, we are relying on the generation of regenerative energies. The ENEV building therefore received a photovoltaic system, the EnerPhIT building a solar thermal system," explains Karl-Heinz Frings, Managing Director of GBG.
"This is where the city of the future with the energy system of the future is being created," explains Bernhard Schumacher, head of the Smart Cities business unit at Mannheim-based energy company MVV. To this end, MVV is using smart technologies and the new possibilities of digitalisation on Franklin and is linking the various sectors intelligently and efficiently with each other - "not only to bring electricity, water, heat and mobility to the district, but also to make the new district the beacon of a necessary energy turnaround at the same time". MVV is also demonstrating what is already possible today in terms of electromobility on Franklin. In addition to environmentally friendly car-sharing solutions, such as FRANKLIN mobil, publicly accessible charging points are being set up, which will be networked with the energy management system and made more flexible. At the same time, the heating sector also plays an indispensable role. MVV has therefore built an innovative low-temperature heating grid here, which also enables the efficient integration of renewable energies.
Another item on the agenda of the visit is the three electric buses of the type E-Citaro, which have been in operation in Franklin on line 67 since April 2019. One of the buses was also funded under SQUARE. The environmentally friendly buses run every 20 minutes between the conversion areas on Franklin and the Käfertal Bahnhof stop. This will give people who already live, work or go to school in Franklin a direct connection to the rnv public transport network. "We are delighted to have EvoBus as a strong partner for this forward-looking project right on the spot," says Martin in der Beek, Technical Managing Director of rnv. "Over the past year, we have gained a lot of valuable knowledge in the operation of conventional electric buses and at the same time proved that the technology can stand up to the rigours of everyday public transport." In the future, however, other forms of propulsion will also be examined, he added. "We are currently looking intensively at the use of hydrogen buses in public transport and will soon be testing this technology at the rnv," reveals in der Beek. "Traveling by public transport is already more environmentally friendly per se than traveling by car, but we want to do even more for climate protection and therefore also convert our vehicle fleet to emission-free drives as far as possible."
The aim of the EnergiespeicherPLUS programme is to drive forward the expansion of photovoltaics in Berlin and to increase the share of renewable energies in electricity consumption, even in times of low sun and low wind. This benefits climate protection, as CO 2 -emissions can be avoided. The Berlin Energy and Climate Protection Programme provides subsidies for the investment costs of electricity storage systems if a photovoltaic system is installed at the same time. The
IBB Business Team GmbH implements the program. Since 1 January 2020, an electronic application for funding can now be submitted quickly and easily to the IBB Business Team GmbH under www.energiespeicherplus.de be put.
Energy Senator Ramona PopEvery Berliner can make a contribution to the energy transition in our capital city. We support this with our Energy Storage PLUS funding programme. I am pleased about the great interest. Since October, over 200 preliminary applications have already been submitted. Every new photovoltaic system helps us get one step closer to our goal of becoming climate neutral."
We subsidise the purchase and commissioning of solar energy storage systems of up to 15,000 euros. If the storage system has a forecast-based operating strategy, a bonus of 300 euros is added. The prerequisite for a subsidy is that a photovoltaic system is purchased and commissioned at the same time as the storage system. The subsidy can be combined with other funding, e.g. from the Funding programme for business-oriented electromobility or from the green roof funding programme, can be combined. All owners of buildings in Berlin can apply for the funding.
3.1.2020 | Source: Berlin Senate Department for Economic Affairs, Energy and Operations
We use cookies to optimize our website and services.
Functional
Always active
Technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a particular service explicitly requested by the subscriber or user or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that have not been requested by the subscriber or user.
Statistics
The technical storage or access, which is solely for statistical purposes.Technical storage or access used solely for anonymous statistical purposes. Without a subpoena, voluntary consent from your Internet service provider, or additional records from third parties, information stored or accessed for this purpose cannot generally be used alone to identify you.
Marketing
Technical storage or access is necessary to create user profiles, to send advertising or to track the user on a website or across multiple websites for similar marketing purposes.