<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>2020-2024 | sdg21</title>
	<atom:link href="https://sdg21.eu/en/dekade/2020-2029/feed" rel="self" type="application/rss+xml" />
	<link>https://sdg21.eu/en/</link>
	<description>Web database of sustainable settlements and neighbourhoods</description>
	<lastbuilddate>Thu, 27 Jun 2024 15:09:06 +0000</lastbuilddate>
	<language>en-GB</language>
	<sy:updateperiod>
	hourly	</sy:updateperiod>
	<sy:updatefrequency>
	1	</sy:updatefrequency>
	<generator>https://wordpress.org/?v=6.8.2</generator>

<image>
	<url>https://sdg21.eu/wp-content/uploads/2017/05/sdg21-logo-02.jpg</url>
	<title>2020-2024 | sdg21</title>
	<link>https://sdg21.eu/en/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Wohnblock “Krokodil” in Winterthur</title>
		<link>https://sdg21.eu/en/db/wohnblock-krokodil-in-winterthur</link>
		
		<dc:creator><![CDATA[sdg21-Redaktion]]></dc:creator>
		<pubdate>Sun, 10 Mar 2024 20:22:51 +0000</pubdate>
				<category><![CDATA[Urbaner Holzbau]]></category>
		<guid ispermalink="false">https://sdg21.eu/?post_type=db&#038;p=29355</guid>

					<description><![CDATA[<p><img class="size-full wp-image-152 alignleft" src="https://plusenergie.sdg21.de/wp-content/uploads/2023/11/CH-13-300x171-1.jpg" alt="" width="300" height="171" /><strong>CH – 8400 Winterthur:</strong> Auf dem ehemaligen Industrieareal “Werk 1” der Schweizerischen Lokomotiv- und Maschinenfabrik (SLM) entsteht in der Stadtmitte von Winterthur ein neuer Stadtteil. Entwickelt von dem Schweizer Bau- und Baudienstleistungsunternehmen Implenia soll auf dem Gebiet ein stark heterogenes Quartier mit insgesamt 750 Wohnungen, zum Teil aus Holz, mehreren Gemeinschafts- sowie Gewerbeflächen errichtet werden. Das Areal soll nachhaltig gestaltet und den Anforderungen der 2000-Watt-Gesellschaft entsprechen. Vorerst soll bis 2021 das zentral gelegene Gebäude mit dem Namen “Krokodil” mit 251 WE in Holzbauweise gebaut werden.<br />
Fertigstellung: 2021. Fertigstellung Gesamtareal (geplant): 2025</p>
The post <a href="https://sdg21.eu/en/db/wohnblock-krokodil-in-winterthur">Wohnblock “Krokodil” in Winterthur</a> first appeared on <a href="https://sdg21.eu/en/">sdg21</a>.]]></description>
		
		
		
			</item>
		<item>
		<title>Stadtquartier &#8222;Neckarpark&#8220; in Stuttgart</title>
		<link>https://sdg21.eu/en/db/beubauquartier-neckarpark-stuttgart</link>
		
		<dc:creator><![CDATA[sdg21-Redaktion]]></dc:creator>
		<pubdate>Thu, 25 Mar 2021 18:19:21 +0000</pubdate>
				<guid ispermalink="false">http://sdg21.eu/?post_type=db&#038;p=27863</guid>

					<description><![CDATA[<p><strong><a href="http://sdg21.eu/wp-content/uploads/2021/03/2018-03_Neckarpark_96dpi.jpg"><img class="alignleft wp-image-27873" title="Photo: Klinger and Partner (Stuttgart)" src="http://sdg21.eu/wp-content/uploads/2021/03/2018-03_Neckarpark_96dpi-560x420.jpg" alt="" width="300" height="225" /></a>70372 Stuttgart:</strong> Europe's largest wastewater heat utilisation plant will in future supply the new residential and commercial area with 850 residential units, commercial areas, parks, squares and streets on a total of 22 hectares and is thus a beacon project for renewable energies. The sewer will provide local heating and cooling via a 300 m long heat exchanger. The system has been installed since 2018 and will be put into operation as soon as the heating centre is also in full operation. The quarter is still under construction. Planned completion of the quarter: 2021</p>
The post <a href="https://sdg21.eu/en/db/beubauquartier-neckarpark-stuttgart">Neckarpark" urban district in Stuttgart</a> first appeared on <a href="https://sdg21.eu/en/">sdg21</a>.]]></description>
		
		
		
			</item>
		<item>
		<title>Wohnprojekt Ro70 eG in Weimar</title>
		<link>https://sdg21.eu/en/db/wohnprojekt-ro70-eg-in-weimar</link>
		
		<dc:creator><![CDATA[sdg21-Redaktion]]></dc:creator>
		<pubdate>Tue, 16 Feb 2021 06:13:33 +0000</pubdate>
				<guid ispermalink="false">http://sdg21.eu/?post_type=db&#038;p=27589</guid>

					<description><![CDATA[<p><strong><a href="http://sdg21.eu/wp-content/uploads/2021/03/ro70_Weimar-11.jpg"><img class="alignleft  wp-image-27738" src="http://sdg21.eu/wp-content/uploads/2021/03/ro70_Weimar-11-560x420.jpg" alt="" width="300" height="225" /></a>99425 Weimar:</strong> In the cooperative "Wohnprojekt Ro70 eG" committed people have come together to transform a former hospital in Weimar into <strong>Thuringia's largest intergenerational housing project </strong>to transform. As of 2020, nearly 130 adults and 70 children live here together in a vibrant neighborhood. Completion: 2020</p>
The post <a href="https://sdg21.eu/en/db/wohnprojekt-ro70-eg-in-weimar">Ro70 eG housing project in Weimar</a> first appeared on <a href="https://sdg21.eu/en/">sdg21</a>.]]></description>
		
		
		
			</item>
		<item>
		<title>Zukunftsquartier &#8222;Schophoven&#8220;</title>
		<link>https://sdg21.eu/en/db/zukunftsquartier-schophoven</link>
		
		<dc:creator><![CDATA[sdg21-Redaktion]]></dc:creator>
		<pubdate>Sat, 17 Oct 2020 04:20:57 +0000</pubdate>
				<guid ispermalink="false">http://sdg21.eu/?post_type=db&#038;p=23924</guid>

					<description><![CDATA[<p><strong><a href="http://sdg21.eu/wp-content/uploads/2016/09/In-Entstehung_gr100px_200dpi.jpg"><img class="alignleft size-full wp-image-9350" src="http://sdg21.eu/wp-content/uploads/2016/09/In-Entstehung_gr100px_200dpi.jpg" alt="" width="25" height="100" /></a>D - 52459 Schophoven:</strong> in Schophoven, on the probable shore edge of the Indesee, a prototypical quarter will be created to serve as a model settlement. Here, work is being done on a structural realisation of the quarter and a transferability of the planning principles to other locations in the Rhenish mining area. Completion: ~2025</p>
The post <a href="https://sdg21.eu/en/db/zukunftsquartier-schophoven">Future quarter "Schophoven</a> first appeared on <a href="https://sdg21.eu/en/">sdg21</a>.]]></description>
		
		
		
			</item>
		<item>
		<title>Wohnsiedlung KOKONI ONE (ehem. &#8222;Gut Buchholz&#8220;) in Berlin-Pankow</title>
		<link>https://sdg21.eu/en/db/gut-buchholz-in-berlin-pankow</link>
		
		<dc:creator><![CDATA[sdg21-Redaktion]]></dc:creator>
		<pubdate>Tue, 31 Mar 2020 17:23:19 +0000</pubdate>
				<guid ispermalink="false">http://sdg21.eu/?post_type=db&#038;p=21579</guid>

					<description><![CDATA[<p><strong><a href="http://sdg21.eu/wp-content/uploads/2021/12/Kokoni_3-1.jpg"><img class="alignleft wp-image-28400" src="http://sdg21.eu/wp-content/uploads/2021/12/Kokoni_3-1-560x364.jpg" alt="" width="300" height="195" /></a><img class="alignleft size-thumbnail wp-image-9350" src="http://sdg21.eu/wp-content/uploads/2016/09/In-Entstehung_gr100px_200dpi-25x100.jpg" alt="In-Entstehung_gr100px_200dpi" width="25" height="100" />D - 13127 Berlin-Pankow: </strong>On a 23,000 sqm plot in Pankow-Französisch Buchholz, a housing estate with 84 residential units with a total living space of approx. 12,000 sqm plus a community house will be built. Predominantly renewable and healthy building materials such as wood and cellulose with positive CO<sub>2</sub>-balance sheet. In the centre of the settlement there is an orchard with a community house. The heat and electricity generation in the settlement is fossil-free. Start of construction/completion (planned): 2022/2024<br class="clear" /></p>
The post <a href="https://sdg21.eu/en/db/gut-buchholz-in-berlin-pankow">KOKONI ONE housing estate (formerly "Gut Buchholz") in Berlin-Pankow</a> first appeared on <a href="https://sdg21.eu/en/">sdg21</a>.]]></description>
		
		
		
			</item>
		<item>
		<title>Solarthermieanlage Römerhügel in Ludwigsburg</title>
		<link>https://sdg21.eu/en/db/solarthermieanlage-roemerhuegel-in-ludwigsburg</link>
		
		<dc:creator><![CDATA[sdg21-Redaktion]]></dc:creator>
		<pubdate>Wed, 26 Feb 2020 07:19:34 +0000</pubdate>
				<guid ispermalink="false">https://siedlungen.eu/?post_type=db&#038;p=21345</guid>

					<description><![CDATA[<p><a href="http://sdg21.eu/wp-content/uploads/2020/02/248205552_171319.jpg"><img class="alignleft size-medium wp-image-21347" src="http://sdg21.eu/wp-content/uploads/2020/02/248205552_171319-300x169.jpg" alt="" width="300" height="169" /></a> <strong>70806 Ludwigsburg: </strong>With a collector area of 14,800 m², Stadtwerke Ludwigsburg-Kornwestheim has built the largest solar thermal plant in Germany. In a 20-meter high heat storage tank with a volume of 2,000 cubic meters, the solar-generated energy is available even when there is little or no solar radiation. The collectors collect around 5200 megawatts of heat per year, enough to supply around 300 average households. Completion: 2020</p>
The post <a href="https://sdg21.eu/en/db/solarthermieanlage-roemerhuegel-in-ludwigsburg">Solar thermal plant Römerhügel in Ludwigsburg</a> first appeared on <a href="https://sdg21.eu/en/">sdg21</a>.]]></description>
		
		
		
			</item>
		<item>
		<title>Siedlungs-PV-Anlage mit 3,4 MWp in Marzahn-Hellersdorf</title>
		<link>https://sdg21.eu/en/db/mieterstrom-pv-anlage-mit-34-mwp-in-marzahn-hellersdorf</link>
		
		<dc:creator><![CDATA[sdg21-Redaktion]]></dc:creator>
		<pubdate>Thu, 17 Oct 2019 15:35:20 +0000</pubdate>
				<guid ispermalink="false">https://siedlungen.eu/?post_type=db&#038;p=19756</guid>

					<description><![CDATA[<p><strong><a href="http://sdg21.eu/wp-content/uploads/2019/10/Mietersonne-Kaulsdorf_02.jpeg"><img class="wp-image-19751 size-medium alignleft" src="http://sdg21.eu/wp-content/uploads/2019/10/Mietersonne-Kaulsdorf_02-300x300.jpeg" alt="" width="300" height="200" /></a> 12619 Berlin Marzahn-Hellersdorf:</strong> Mietersonne Kaulsdorf, Germany's largest tenant power project with almost 3.4 megawatts (MW) of capacity, is being built by Berliner Stadtwerke for the Berlin housing association berlinovo in Marzahn-Hellersdorf. Tenants of 4,300 apartments will be able to benefit from the green electricity generated directly on their roofs.</p>
The post <a href="https://sdg21.eu/en/db/mieterstrom-pv-anlage-mit-34-mwp-in-marzahn-hellersdorf">Residential PV plant with 3.4 MWp in Marzahn-Hellersdorf</a> first appeared on <a href="https://sdg21.eu/en/">sdg21</a>.]]></description>
		
		
		
			</item>
		<item>
		<title>Überseeinsel Bremen</title>
		<link>https://sdg21.eu/en/db/ueberseeinsel-bremen</link>
		
		<dc:creator><![CDATA[sdg21-Redaktion]]></dc:creator>
		<pubdate>Sat, 24 Aug 2019 16:27:14 +0000</pubdate>
				<category><![CDATA[Nutzungsgemischte Quartiere]]></category>
		<category><![CDATA[Nutzungsmischung]]></category>
		<guid ispermalink="false">https://siedlungen.eu/?post_type=db&#038;p=17828</guid>

					<description><![CDATA[<p><a href="http://sdg21.eu/wp-content/uploads/2019/08/Dominik-Heers-IMG-20190823-WA0001.jpg"><img class="alignleft wp-image-17830 size-medium" src="http://sdg21.eu/wp-content/uploads/2019/08/Dominik-Heers-IMG-20190823-WA0001-300x225.jpg" alt="" width="300" height="225" /><br />
<a href="http://sdg21.eu/wp-content/uploads/2016/09/In-Entstehung_gr100px_200dpi.jpg"><img class="alignleft size-full wp-image-9350" src="http://sdg21.eu/wp-content/uploads/2016/09/In-Entstehung_gr100px_200dpi.jpg" alt="" width="25" height="100" /></a><strong>D - 28217 Bremen:</strong> With the development of the 15-hectare former Kelloggs factory site on the south side of the Europahafen, a new mixed urban quarter is to be created in Bremen in the immediate vicinity of the city centre and directly on the Weser. In addition to a variety of residential options, it will include office and commercial space, schools and daycare centers, recreational facilities and public spaces. Modern ecological mobility and energy concepts and sophisticated architecture determine the image of the quarter. Planned start of construction: 2021, planned completion: ~2031</p>
The post <a href="https://sdg21.eu/en/db/ueberseeinsel-bremen">Overseas island Bremen</a> first appeared on <a href="https://sdg21.eu/en/">sdg21</a>.]]></description>
		
		
		
			</item>
		<item>
		<title>Quartier „Lok.West“ mit Power-to-Gas-Technologie in Esslingen</title>
		<link>https://sdg21.eu/en/db/power-to-gas-quartier-esslingen</link>
		
		<dc:creator><![CDATA[sdg21-Redaktion]]></dc:creator>
		<pubdate>Sun, 04 Aug 2019 12:05:19 +0000</pubdate>
				<category><![CDATA[Nutzungsgemischte Quartiere]]></category>
		<guid ispermalink="false">https://siedlungen.eu/?post_type=db&#038;p=16969</guid>

					<description><![CDATA[<p><strong><img class="alignleft size-thumbnail wp-image-9350" src="http://sdg21.eu/wp-content/uploads/2016/09/In-Entstehung_gr100px_200dpi-25x100.jpg" alt="In-Entstehung_gr100px_200dpi" width="25" height="100" />73728 Esslingen Neue Weststadt:</strong> A "showcase neighbourhood" with 600 flats, office and commercial space as well as a new building for Esslingen University of Applied Sciences is being built on 12 hectares. The total investment volume is around 190 million euros. 30 per cent of the district's use is earmarked for commercial use. Construction of individual building blocks began in 2016 and will continue until around 2022. Planned completion: 2022</p>
The post <a href="https://sdg21.eu/en/db/power-to-gas-quartier-esslingen">Lok.West" neighbourhood with power-to-gas technology in Esslingen</a> first appeared on <a href="https://sdg21.eu/en/">sdg21</a>.]]></description>
		
		
		
			</item>
		<item>
		<title>Faktor-X-Siedlung „Vöckelsberg“</title>
		<link>https://sdg21.eu/en/db/faktor-x-siedlung-voeckelsberg</link>
		
		<dc:creator><![CDATA[sdg21-Redaktion]]></dc:creator>
		<pubdate>Thu, 01 Aug 2019 12:17:34 +0000</pubdate>
				<category><![CDATA[Faktor-X-Siedlungen]]></category>
		<guid ispermalink="false">https://siedlungen.eu/?post_type=db&#038;p=16942</guid>

					<description><![CDATA[<p><strong><a href="http://sdg21.eu/wp-content/uploads/2016/09/In-Entstehung_gr100px_200dpi.jpg"><img class="alignleft size-full wp-image-9350" src="http://sdg21.eu/wp-content/uploads/2016/09/In-Entstehung_gr100px_200dpi.jpg" alt="" width="25" height="100" /></a>D - 52249 Eschweiler:</strong> the municipality of Eschweiler has designated a second Factor X housing estate with 34 plots on 3.1 hectares in the development plan. Construction of the first houses can begin as early as April. Resource- and energy-efficient single-family houses will be built on around 30 plots and four multi-family houses will be built according to the Factor X concept. Further elements of sustainable urban development, such as extensively greened roofs and a central heat supply using wood pellets, are planned. RWE Power is the landowner and developer. The development was completed in spring 2019.</p>
The post <a href="https://sdg21.eu/en/db/faktor-x-siedlung-voeckelsberg">Factor X settlement "Vöckelsberg</a> first appeared on <a href="https://sdg21.eu/en/">sdg21</a>.]]></description>
		
		
		
			</item>
	</channel>
</rss>