
D - 40549 Düsseldorf-Heerdt: 156 units, 60 permaculture tenant gardens, ecological centre for offers of eco-educational work for primary school classes and kindergartens.
A further 20 - 30 single-family houses (linked to a geothermal heating project), a multi-storey residential building and a kindergarten are planned.
| Street | At the ecotope |
| Form(s) of ownership | 120 rental apartments, 84 of which are subsidized, 20 condominiums and 25 single-family homes have been built so far. A further 20 - 30 single-family homes (linked to a geothermal heating project), a multi-storey apartment building and a kindergarten are planned. |
| Location (project) | Urban fringe |
| Size (WE) | 156 (as at: 9/2016) |
| Ecology |
|
| Waste/water | Reduction of drinking water demand, reduction of water supply, restoration of the natural water cycle |
| Waste | Waste reduction |
| Energy | Low energy consumption, low-energy construction method |
| Building Biology | Avoidance of additional environmental pollution due to building materials |
| Traffic | Parking space free settlement |
| Outdoor facilities | Natural gardens |
| Climate | Improvement of air quality |
| Socio-cultural |
Common areas and squares in the settlement |
| Contact | Ökotop Heerdt e.V. 40549 Düsseldorf / Architect Prof. Löschke |
| Sources | Ecological settlement construction in the FRG Work of the UNI/GHS Essen p. 153 f |
| Notes | Ecotope [Greek tópos "place", "area"] the smallest ecological unit of a landscape [Brockhaus 1999]. |
| Awards | 2008: Werkbund label Deutscher Werkbund Baden-Württemberg e.V. 1999 and 2007: awarded as a future project within the framework of the Robert Jungk Prize 1996: Award at the second summit conference of "Habitat II" in Istanbul/Turkey as one of the ten best landscape projects worldwide 1987, 1990, 1991: Environmental Protection Award of the State City of Düsseldorf 1986: awarded at the state competition "Ecological Building" by the Minister for Urban Development, Housing and Transport of the State of NRW |
| Links | www.oekotop.de |
Zuletzt aktualisiert: 1. April 2024
Similar projects on sdg21:
All project/s of the planning office: ; City region: Düsseldorf and surrounding area; Country: Germany; Bundesland: NRW; Characteristics: 03 - 4 floors, Eco-settlement; typology: Settlement; Thematic: Organic horticulture, Permaculture, Free of parking spaces
40625 Düsseldorf-Gerresheim: the wmk assembly3 is located on the "Am Quellenbusch" site in the Düsseldorf district of Gerresheim. In the entire construction area, 800 residential units will be built. The completion of the 30 wmk3 apartments was in 2017.

