<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>XL (500 bis 999) | sdg21</title>
	<atom:link href="https://sdg21.eu/en/groesse/xl/feed" rel="self" type="application/rss+xml" />
	<link>https://sdg21.eu/en/</link>
	<description>Web database of sustainable settlements and neighbourhoods</description>
	<lastbuilddate>Sat, 15 Feb 2025 17:36:48 +0000</lastbuilddate>
	<language>en-GB</language>
	<sy:updateperiod>
	hourly	</sy:updateperiod>
	<sy:updatefrequency>
	1	</sy:updatefrequency>
	<generator>https://wordpress.org/?v=6.8.2</generator>

<image>
	<url>https://sdg21.eu/wp-content/uploads/2017/05/sdg21-logo-02.jpg</url>
	<title>XL (500 bis 999) | sdg21</title>
	<link>https://sdg21.eu/en/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Stadtquartier &#8222;Neckarpark&#8220; in Stuttgart</title>
		<link>https://sdg21.eu/en/db/beubauquartier-neckarpark-stuttgart</link>
		
		<dc:creator><![CDATA[sdg21-Redaktion]]></dc:creator>
		<pubdate>Thu, 25 Mar 2021 18:19:21 +0000</pubdate>
				<guid ispermalink="false">http://sdg21.eu/?post_type=db&#038;p=27863</guid>

					<description><![CDATA[<p><strong><a href="http://sdg21.eu/wp-content/uploads/2021/03/2018-03_Neckarpark_96dpi.jpg"><img class="alignleft wp-image-27873" title="Photo: Klinger and Partner (Stuttgart)" src="http://sdg21.eu/wp-content/uploads/2021/03/2018-03_Neckarpark_96dpi-560x420.jpg" alt="" width="300" height="225" /></a>70372 Stuttgart:</strong> Europe's largest wastewater heat utilisation plant will in future supply the new residential and commercial area with 850 residential units, commercial areas, parks, squares and streets on a total of 22 hectares and is thus a beacon project for renewable energies. The sewer will provide local heating and cooling via a 300 m long heat exchanger. The system has been installed since 2018 and will be put into operation as soon as the heating centre is also in full operation. The quarter is still under construction. Planned completion of the quarter: 2021</p>
The post <a href="https://sdg21.eu/en/db/beubauquartier-neckarpark-stuttgart">Neckarpark" urban district in Stuttgart</a> first appeared on <a href="https://sdg21.eu/en/">sdg21</a>.]]></description>
		
		
		
			</item>
		<item>
		<title>ecovillage Hannover</title>
		<link>https://sdg21.eu/en/db/ecovillage-hannover</link>
		
		<dc:creator><![CDATA[sdg21-Redaktion]]></dc:creator>
		<pubdate>Wed, 17 Feb 2021 10:08:51 +0000</pubdate>
				<guid ispermalink="false">http://sdg21.eu/?post_type=db&#038;p=27594</guid>

					<description><![CDATA[<p><strong><span class="postal-code"><a href="http://sdg21.eu/wp-content/uploads/2021/02/studiomauer-und-cityfoerster_masterplan_1280.jpg"><img class="wp-image-27596 alignleft" src="http://sdg21.eu/wp-content/uploads/2021/02/studiomauer-und-cityfoerster_masterplan_1280-560x375.jpg" alt="" width="300" height="201" /></a>D - 30539</span> Hanover Kronsberg:</strong> adjacent to the Expo-Settlement <a href="http://sdg21.eu/db/hannover-kronsberg">Hanover-Kronsberg</a> soll das "ecovillage Kronsberg" entstehen. Träger ist die Genossenschaft ecovillage hannover eG, die 2019 gegründet wurde. Die Genossenschaft hat das 49.300 m² große Grundstück 2021 von der Stadt Hannover gekauft. Ab 5/2024 befindet sich die Genossenschaft in einem Insolvenzverfahren in Eigenverwaltung. Fertigstellung: ?</p>
The post <a href="https://sdg21.eu/en/db/ecovillage-hannover">ecovillage Hanover</a> first appeared on <a href="https://sdg21.eu/en/">sdg21</a>.]]></description>
		
		
		
			</item>
		<item>
		<title>Kreativquartier in Holzbauweise für München</title>
		<link>https://sdg21.eu/en/db/kreativquartier</link>
		
		<dc:creator><![CDATA[sdg21-Redaktion]]></dc:creator>
		<pubdate>Mon, 01 Jun 2020 14:24:14 +0000</pubdate>
				<guid ispermalink="false">http://sdg21.eu/?post_type=db&#038;p=23211</guid>

					<description><![CDATA[<p><strong><a href="http://sdg21.eu/wp-content/uploads/2020/06/KreativQuartier.jpg"><img class="alignleft wp-image-23396 size-medium" title="© Fig.: &quot;Teleinternetcafe&quot; and &quot;Greenhouse" src="http://sdg21.eu/wp-content/uploads/2020/06/KreativQuartier-300x129.jpg" alt="" width="300" height="129" /></a><a href="http://sdg21.eu/wp-content/uploads/2016/09/In-Entstehung_gr100px_200dpi.jpg"><img class="alignleft size-full wp-image-9350" src="http://sdg21.eu/wp-content/uploads/2016/09/In-Entstehung_gr100px_200dpi.jpg" alt="" width="25" height="100" /></a>D - 80335 Munich:</strong> On the site of the former Luitpold barracks and neighbouring areas, a total of around 900 flats and space for 770 workplaces are to be built in a new mixed-use urban quarter. According to a resolution passed by the city of Munich's planning committee on 20 May 2020, 370 residential units are to be built in timber construction in the "Kreativfeld", part of the creative quarter. The urban neighbourhood between Dachauer-, Loth-, Schwere-Reiter-, Heß- and Infanteriestraße will combine living and working with art, culture and knowledge. Twelve building neighbourhoods and a mixed-use area are to be created. Tenders for building cooperatives and developers are due to start soon on the "Kreativfeld" (as of 4 June 2020). Completion (1st BA Kreativfeld): ~2024</p>
The post <a href="https://sdg21.eu/en/db/kreativquartier">Creative quarter in timber construction for Munich</a> first appeared on <a href="https://sdg21.eu/en/">sdg21</a>.]]></description>
		
		
		
			</item>
		<item>
		<title>Energie Plus Quartier Vellmar-Nord</title>
		<link>https://sdg21.eu/en/db/energie-plus-quartier-vellmar-nord</link>
		
		<dc:creator><![CDATA[sdg21-Redaktion]]></dc:creator>
		<pubdate>Tue, 11 Feb 2020 14:14:22 +0000</pubdate>
				<guid ispermalink="false">https://siedlungen.eu/?post_type=db&#038;p=21243</guid>

					<description><![CDATA[<p><a href="http://sdg21.eu/wp-content/uploads/2016/09/In-Entstehung_gr100px_200dpi.jpg"><img class="alignleft size-full wp-image-9350" src="http://sdg21.eu/wp-content/uploads/2016/09/In-Entstehung_gr100px_200dpi.jpg" alt="" width="25" height="100" /></a><strong>D - 34246 Vellmar-Nord:</strong> The urban design, with around 550 residential units on a 16-hectare site, envisages a mix of detached single houses and houses in a more compact design using semi-detached and terraced houses and multi-storey housing. In terms of size, it will be one of the largest plus-energy housing estates in Germany. The plus-energy concept takes into account heat, electricity and mobility. Start of construction: from April 2020. Completion: ~2024</p>
The post <a href="https://sdg21.eu/en/db/energie-plus-quartier-vellmar-nord">Energy Plus Quarter Vellmar North</a> first appeared on <a href="https://sdg21.eu/en/">sdg21</a>.]]></description>
		
		
		
			</item>
		<item>
		<title>Platensiedlung in Frankfurt-Ginnheim</title>
		<link>https://sdg21.eu/en/db/platensiedlung-in-frankfurt-ginnheim</link>
		
		<dc:creator><![CDATA[sdg21-Redaktion]]></dc:creator>
		<pubdate>Fri, 13 Dec 2019 13:42:22 +0000</pubdate>
				<guid ispermalink="false">https://siedlungen.eu/?post_type=db&#038;p=20316</guid>

					<description><![CDATA[<p><strong>D - Frankfurt a.M. Ginnheim:</strong> The 342 existing apartments in the 19 three-storey row buildings will be renovated to improve energy efficiency (insulation and new windows) and two storeys will be added. A total of around 680 new, mainly smaller apartments are being created. 300 apartments are being built in 15 new buildings in so-called gate and bridge houses. Architecture: Stefan Forster (Frankfurt). Construction began in 2017. Completion of the storeys: End of 2019. Completion of the new buildings (post-densification): 2023.</p>
The post <a href="https://sdg21.eu/en/db/platensiedlung-in-frankfurt-ginnheim">Platensiedlung in Frankfurt-Ginnheim</a> first appeared on <a href="https://sdg21.eu/en/">sdg21</a>.]]></description>
		
		
		
			</item>
		<item>
		<title>Quartier „Lok.West“ mit Power-to-Gas-Technologie in Esslingen</title>
		<link>https://sdg21.eu/en/db/power-to-gas-quartier-esslingen</link>
		
		<dc:creator><![CDATA[sdg21-Redaktion]]></dc:creator>
		<pubdate>Sun, 04 Aug 2019 12:05:19 +0000</pubdate>
				<category><![CDATA[Nutzungsgemischte Quartiere]]></category>
		<guid ispermalink="false">https://siedlungen.eu/?post_type=db&#038;p=16969</guid>

					<description><![CDATA[<p><strong><img class="alignleft size-thumbnail wp-image-9350" src="http://sdg21.eu/wp-content/uploads/2016/09/In-Entstehung_gr100px_200dpi-25x100.jpg" alt="In-Entstehung_gr100px_200dpi" width="25" height="100" />73728 Esslingen Neue Weststadt:</strong> A "showcase neighbourhood" with 600 flats, office and commercial space as well as a new building for Esslingen University of Applied Sciences is being built on 12 hectares. The total investment volume is around 190 million euros. 30 per cent of the district's use is earmarked for commercial use. Construction of individual building blocks began in 2016 and will continue until around 2022. Planned completion: 2022</p>
The post <a href="https://sdg21.eu/en/db/power-to-gas-quartier-esslingen">Lok.West" neighbourhood with power-to-gas technology in Esslingen</a> first appeared on <a href="https://sdg21.eu/en/">sdg21</a>.]]></description>
		
		
		
			</item>
		<item>
		<title>GWL-Terrein Amsterdam-Westerpark</title>
		<link>https://sdg21.eu/en/db/gwl-terrein-amsterdam-westerpark</link>
		
		<dc:creator><![CDATA[sdg21-Redaktion]]></dc:creator>
		<pubdate>Fri, 04 Jan 2019 04:51:47 +0000</pubdate>
				<category><![CDATA[Autofreies Wohnen]]></category>
		<category><![CDATA[Nutzungsgemischte Quartiere]]></category>
		<guid ispermalink="false">https://siedlungen.eu/?post_type=db&#038;p=16164</guid>

					<description><![CDATA[<p><strong><a href="http://sdg21.eu/wp-content/uploads/2017/08/Westerpark-007.jpg"><img class="alignleft size-medium wp-image-14503" src="http://sdg21.eu/wp-content/uploads/2017/08/Westerpark-007-300x200.jpg" alt="" width="300" height="200" /></a>NL - Amsterdam-Westerpark:</strong> with 600 apartments for 1400 inhabitants on 6 hectares, the GWL-Terrein is the largest contiguous car-free housing estate in Europe. Number of parking spaces: 0.2. Completion: 1998</p>
The post <a href="https://sdg21.eu/en/db/gwl-terrein-amsterdam-westerpark">GWL-Terrein Amsterdam-Westerpark</a> first appeared on <a href="https://sdg21.eu/en/">sdg21</a>.]]></description>
		
		
		
			</item>
		<item>
		<title>Stegerwaldsiedlung, Köln</title>
		<link>https://sdg21.eu/en/db/stegerwaldsiedlung-koeln</link>
		
		<dc:creator><![CDATA[sdg21-Redaktion]]></dc:creator>
		<pubdate>Thu, 15 Nov 2018 17:11:50 +0000</pubdate>
				<category><![CDATA[Bestandssanierung]]></category>
		<category><![CDATA[Solarsiedlung]]></category>
		<guid ispermalink="false">https://siedlungen.eu/?post_type=db&#038;p=15948</guid>

					<description><![CDATA[<p><strong> <a href="http://sdg21.eu/wp-content/uploads/2018/11/Koeln-Stegerwaldsiedlung-Bild-2.jpg"><img class="alignleft wp-image-27468" title="Photo: EnergyAgency.NRW" src="http://sdg21.eu/wp-content/uploads/2018/11/Koeln-Stegerwaldsiedlung-Bild-2-560x315.jpg" alt="Foto: EnergieAgentur.NRW" width="300" height="169" /></a>51063 Cologne-Mülheim:</strong> The state of North Rhine-Westphalia has named the Stegerwaldsiedlung in the Cologne district of Mülheim as the 87th climate protection estate. With 968 kWp, it has the largest roof-integrated PV system on a housing estate in NRW and the third largest in Germany. 689 residential units of the Cologne housing estate from the 1950s were refurbished for energy efficiency and the energy generation systems were renewed. Completion: 2019</p>
The post <a href="https://sdg21.eu/en/db/stegerwaldsiedlung-koeln">Stegerwaldsiedlung, Cologne</a> first appeared on <a href="https://sdg21.eu/en/">sdg21</a>.]]></description>
		
		
		
			</item>
		<item>
		<title>Klima- und Holzbauquartier &#8222;Ellener Hof&#8220;</title>
		<link>https://sdg21.eu/en/db/stiftungsdorf-ellener-hof-oekologisch-gebaut-bunt-gemischt</link>
		
		<dc:creator><![CDATA[sdg21-Redaktion]]></dc:creator>
		<pubdate>Tue, 10 Apr 2018 20:46:28 +0000</pubdate>
				<category><![CDATA[Autofreies Wohnen]]></category>
		<category><![CDATA[Erneuerbare]]></category>
		<category><![CDATA[Holzbau]]></category>
		<category><![CDATA[Nutzungsgemischte Quartiere]]></category>
		<category><![CDATA[Nutzungsmischung]]></category>
		<guid ispermalink="false">https://siedlungen.eu/?post_type=db&#038;p=15178</guid>

					<description><![CDATA[<p><a href="https://sdg21.eu/wp-content/uploads/2018/04/20180907_Enthuellung_Bauschild_Ellener_Hof.jpg"><img class="alignleft wp-image-16092 size-medium" src="https://sdg21.eu/wp-content/uploads/2018/04/20180907_Enthuellung_Bauschild_Ellener_Hof-300x283.jpg" alt="" width="300" height="283" /><br />
<strong><a href="https://sdg21.eu/wp-content/uploads/2016/09/In-Entstehung_gr100px_200dpi.jpg"><img class="alignleft size-full wp-image-9350" src="https://sdg21.eu/wp-content/uploads/2016/09/In-Entstehung_gr100px_200dpi.jpg" alt="" width="25" height="100" /></a>D - 28329 Bremen-Osterholz: </strong>At least 500 apartments are planned, which will offer a new home to around 1,000 Bremen residents of all ages and from different social classes and cultures. In close cooperation with the Free Hanseatic City of Bremen, the Bremer Heimstiftung, as the owner of the site, is therefore not only working on new living space. Social institutions, clubs and cultural institutions will also enrich the "Ellener Hof Foundation Village" in the future. In addition, the partners are focusing on attractive green spaces. The respectful treatment of the valuable stock of trees, bushes and vegetation on the property is the basis and an integral part of all planning. Construction began on 7.9.2018. Planned completion: 2025(?)</p>
The post <a href="https://sdg21.eu/en/db/stiftungsdorf-ellener-hof-oekologisch-gebaut-bunt-gemischt">Ellener Hof" climate and timber construction quarter</a> first appeared on <a href="https://sdg21.eu/en/">sdg21</a>.]]></description>
		
		
		
			</item>
		<item>
		<title>Westend Berlin-Charlottenburg</title>
		<link>https://sdg21.eu/en/db/westend-berlin-charlottenburg</link>
		
		<dc:creator><![CDATA[sdg21-Redaktion]]></dc:creator>
		<pubdate>Tue, 22 Aug 2017 17:36:17 +0000</pubdate>
				<category><![CDATA[Autofreies Wohnen]]></category>
		<category><![CDATA[Baubiologie]]></category>
		<category><![CDATA[BHKW]]></category>
		<category><![CDATA[Cradle to Cradle]]></category>
		<category><![CDATA[Dachbegrünungen]]></category>
		<category><![CDATA[DGNB]]></category>
		<category><![CDATA[Grauwasserklärung]]></category>
		<category><![CDATA[Holzbau]]></category>
		<category><![CDATA[Nachhaltiges Wasserkonzept]]></category>
		<category><![CDATA[Nutzungsgemischte Quartiere]]></category>
		<category><![CDATA[Regenwasserversickerung]]></category>
		<category><![CDATA[Ressourceneffizientes Bauen]]></category>
		<guid ispermalink="false">https://www.siedlungen.eu/?post_type=db&#038;p=11879</guid>

					<description><![CDATA[<p><strong><a href="http://sdg21.eu/wp-content/uploads/2016/11/westend.jpg"><img class="alignleft wp-image-11881 size-medium" title="Fig.: Deutsche Wohnen" src="http://sdg21.eu/wp-content/uploads/2016/11/westend-300x202.jpg" alt="Westend Berlin-Charlottenburg" width="300" height="202" /></a><a href="http://sdg21.eu/wp-content/uploads/2016/09/In-Entstehung_gr100px_200dpi.jpg"><img class="alignleft size-thumbnail wp-image-9350" src="http://sdg21.eu/wp-content/uploads/2016/09/In-Entstehung_gr100px_200dpi-25x100.jpg" alt="In-Entstehung_gr100px_200dpi" width="25" height="100" /></a>D - 14055 Berlin-Charlottenburg:</strong> 665 units as a new housing estate with two-, three- and four-room apartments. Furthermore, single-family homes, shops, medical practices and a daycare center. Mixture of rental and owner-occupied apartments.</p>
<p>On 3/14/2018, after 5 years of negotiations, the contract was signed. The company expects construction to start at the end of 2019, and the last construction phase could be completed in 2025.</p>
<p>Low-energy house standard, CHP, photovoltaic system, sustainable mobility concept with bicycle parking in front of the front doors and e-bikes, electric cars in the car-sharing fleet. Quarter with Cradle to Cradle certification and healthy building materials, green roof.</p>
The post <a href="https://sdg21.eu/en/db/westend-berlin-charlottenburg">Westend Berlin-Charlottenburg</a> first appeared on <a href="https://sdg21.eu/en/">sdg21</a>.]]></description>
		
		
		
			</item>
	</channel>
</rss>