100 - 199 WE
Johannis Gardens Berlin-Johannisthal
Size: 314 CU . Plot: 2.6 hectare12487 Berlin: HOWOGE is building 314 apartments, a large daycare facility for children and a neighbourhood garage on a 2.6-hectare site on Straße am Flugplatz. 156 apartments will be rented out as subsidized housing in accordance with the cooperation agreement with the state of Berlin; the remaining units will cost less than 10 euros per square meter on average. After completion, 50 percent of the apartments will be subject to occupancy restrictions, costing 6.50 euros per square meter cold, and will be sold to prospective tenants with a certificate of entitlement to housing. Planned completion (as of 12/2020): Spring 2021
Show more >> – – – – – – – – – – – – – – – – – –
Building area Smiley West
Size: 190 CU . Plot: Hectare76185 Karlsruhe-Nordstadt: 190 DWELLING UNITS. Conversion site, building groups, cube houses by the Evaplan planning group, low-energy house standard, district heating, rainwater infiltration, green roofs, in individual cases use of rainwater, protection of existing vegetation. Completion: 2004
Show more >> – – – – – – – – – – – – – – – – – –
eQ Ecoquartier Pfaffenhofen
Size: 180 CU . Plot: 21.7 hectares85276 Pfaffenhofen: On over 91,000 m2 approx. 250 residential units and commercial areas are being built. Condominiums, semi-detached and terraced houses, as well as single-family houses were built. Slightly more than 50 residential units and the daycare center were built in timber construction. There was also the possibility of acquiring plots of land and building on them yourself. Completion: 2017
Show more >> – – – – – – – – – – – – – – – – – –
Model project "Berliner Strasse 88
Size: 171 CU . Plot: Hectare14169 Berlin-Zehlendorf: "Social multi-storey housing": 171 WEs, rainwater concept, low-energy construction (1982!), low-temperature heating via return flow of the district heating network, completion: 1992
Show more >> – – – – – – – – – – – – – – – – – –
Car-free settlement Saarlandstraße
Size: 170 CU . Plot: Hectare22303 Hamburg-Barmbek: 170 units, one of the largest car-free housing estates in Germany, parking space key 0.15 PkWs/WE. Completion: 1997
Show more >> – – – – – – – – – – – – – – – – – –
Student dormitory as mound houses
Size: 158 CU . Plot: Hectare70599 Stuttgart-Hohenheim: Planning: H. Schmitges, N. Kaiser, G. Minke, 3-4 storeys, 158 flatshare rooms in 6 houses, ventilation heat recovery, wall radiation heating, occupation: 1983
Show more >> – – – – – – – – – – – – – – – – – –
Ecotope Heerdt
Size: 156 CU . Plot: HectareD - 40549 Düsseldorf-Heerdt: 156 units, 60 permaculture tenant gardens, ecological centre for offers of eco-educational work for primary school classes and kindergartens.
A further 20 - 30 single-family houses (linked to a geothermal heating project), a multi-storey residential building and a kindergarten are planned.
Show more >> – – – – – – – – – – – – – – – – – –
Old foundry, Winterthur
Size: 155 CU . Plot: 1.1 hectareCH - Winterthur: Das Mehrgenerationenhaus Giesserei liegt in Oberwinterthur, im Stadtzentrum Neuhegi unmittelbar am Eulachpark. Es verfügt über 155 Wohnungen und 14 Gewerbebetriebe. Die Gebäude sind in ökologischer Holzbauweise erstellt und erfüllen den Minergie-P-Eco-Standard. Die Giesserei gilt mit nur 0,2 Parkplätzen pro Wohnung und 480 Veloständern als autofreie Siedlung. Grundstücksfläche: 11 000 m². Fertigstellung: 2013
Show more >> – – – – – – – – – – – – – – – – – –
Solar housing estate "Auf dem Kruge" Bremen
Size: 152 CU . Plot: Hectare28239 Bremen: the solar power plant with 206 kWpeak was one of the largest PV plants integrated into the roofs of the 152 residential buildings in Europe when it was commissioned. Completion: 1995
Show more >> – – – – – – – – – – – – – – – – – –
"50 Morgen" Hohenwettersbach
Size: 150 CU . Plot: Hectare76228 Karlsruhe-Hohenwettersbach: "50 acres": 150 units. Various architects and developers, including P.I.A., Gisa and Ingo Bohning, LEG Baden-Württemberg. Energy is supplied via a local heating network, which draws electricity and heat from a combined heat and power plant (CHP). The CHP burns biogas obtained from part of Karlsruhe's biowaste. Some of the buildings were constructed as passive houses and ecological materials were used. Completion: 2004
Show more >> – – – – – – – – – – – – – – – – – –
PlusEnergy Quarter Oberursel
Size: 150 CU . Plot: Hectare61440 Oberursel3 new office buildings, 18 new residential buildings, GFZ: 1.06; The largest PlusEnergy quarter could have been built in Oberursel near Frankfurt with around 150 apartments and commercial use in 3 office buildings and 18 residential buildings as new buildings.
Show more >> – – – – – – – – – – – – – – – – – –
Wooden housing estate Ingolstadt
Size: 142 CU . Plot: Hectare85049 Ingolstadt: With 116 units in timber construction out of a total of 142 units, this is one of the larger timber housing estates in Germany. It was realised in three construction phases, with 81 units by bogevischs buero architekten & stadtplaner gmbh, Munich; as well as 35 by Behnisch Architekten, Stgt. and 26 units by Brand Architekten, Ingolstadt (in mineral construction); client: St. Gundekar-Werk Wohnungs- und Städtebaugesellschaft mbH, Schwabach. Completion: 2011
Show more >> – – – – – – – – – – – – – – – – – –
Design study "Car-free solar settlement Nancystrasse
Size: 140 CU . Plot: Hectare76187 Karlsruhe-Nordweststadt: the design was planned for an undeveloped plot of land as a student research project at the University of Karlsruhe in cooperation with the association ASKA e.V., but was not realized. Concept: 140 units, photovoltaic and biomass CHP, business and office facilities, community facilities, gastronomy, car sharing tower, reed sewage treatment plant, board stack wood construction, hemp, flax or cellulose insulation, social settlement concept, integrated living. Completion: not realized
Show more >> – – – – – – – – – – – – – – – – – –
Gartenhofsiedlung Weißenburg
Size: 138 CU . Plot: Hectare48143 Münster: Car-free NRW model housing estate "Gartenhofsiedlung Weißenburg", Europe-wide competition, car-reduced mobility concept with 0.2 parking spaces per dwelling, 189 dwellings on 3.8 ha site area. Completion: 2003, completion of 2nd construction phase (4 buildings with 51 flats): 2019
Show more >> – – – – – – – – – – – – – – – – – –
Documenta Urbana, Kassel-Dönche
Size: 137 CU . Plot: Hectare34134 Kassel: 137 units; various architects including Baufrrösche, Roland Rainer, Otto Steidle. Construction: 1980- 82. There has only been one building exhibition "documenta urbana", which was created in the context of the "documenta 7" in 1982.
Show more >> – – – – – – – – – – – – – – – – – –
Limnologists Växjö
Size: 134 CU . Plot: HectareSE - Växjö: four buildings with 8 floors, 134 apartments with 37 - 114 m2, total living space: 10,700 m2, construction time for one floor: 10 days (334 sqm living space per floor), architecture: Arkitektbolaget Kronoberg, completion: 2009
Show more >> – – – – – – – – – – – – – – – – – –
Wooden housing estate "Permoserstrasse" in Ingolstadt
Size: 132 CU . Plot: Hectare85057 Ingolstadt: 132 WE + 2 community houses as prefabricated 3-storey timber frame construction. 795 €/m2 (<=> 1,590.70 DM/sqm WF; 159,714.29 DM/WE). Developed within the framework of the "Siedlungsmodelle Bayern". It is the first "real" timber housing estate with over 100 residential units, at least in Europe. Architecture: Project consortium Sampo Widmann with Prof. Hermann Schröder. Developer: Gemeinnützige Wohnungsgesellschaft Ingolstadt. Completion: 1994
Show more >> – – – – – – – – – – – – – – – – – –
Solar settlement Bramfeld
Size: 130 CU . Plot: Hectare22175 Hamburg-Bramfeld: 130 WE, one of the larger solar local heating projects with a 4,000 m3-water storage tank. Completion: 2000
Show more >> – – – – – – – – – – – – – – – – – –
Ecological settlement Bielefeld-Waldquelle
Size: 130 CU . Plot: Hectare33649 Bielefeld-Quelle: 96 units, architect: Hans-Friedrich Bültmann, special features: all buildings are equipped with composting toilets and the highest composting toilet in Europe is located on the 5th floor. Further water measures: rainwater infiltration, own drinking water source; a reed sewage treatment plant was planned but could not be realised. Energy: BHKW, local heating network, internal cable TV, telephone distribution. Social: KiTa, craftsmen's yard, cooperative project. Economy: Development as a large plot, low-cost construction with partly much own work. Construction time: 1997
Show more >> – – – – – – – – – – – – – – – – – –
Heinrichstrasse" residential park in Hamm
Size: 130 CU . Plot: Hectare59077 Hamm: In the immediate vicinity of a central service area in the Pelkum district of Hammer, around 130 residential units have been built in ecological and at the same time cost-effective timber construction. To date (as of 12/2017), it is the largest timber housing estate in Germany. Completion: 1998
Show more >> – – – – – – – – – – – – – – – – – –
Resource conservation settlement in Kaster
Size: 130 CU . Plot: 5.6 hectaresD - 50181 Bedburg Kaster: Around 150 residential units on 5.6 hectares are planned in the first resource conservation housing estate of the town of Bedburg and RWE Power. The conservation of natural resources is at the forefront of this project, which is being developed under the name "Factor X", already established in specialist circles. Further key data: 55,500 square metres of living space, around 110 building plots and an extension of the forest kindergarten are planned.
Show more >> – – – – – – – – – – – – – – – – – –
Arcadia Winnenden
Size: 129 CU . Plot: 3.4 hectare71364 Winnenden: 129 residential units in multi-family houses, chain houses, terraced houses and single-family houses on a conversion site (approx. 3.4 ha) close to the city centre, a former industrial wasteland, the new ecologically sustainable quarter was created. The focal points of the concept are an economical development, a central lake also for rainwater retention, a detailed surface and green concept, as well as a Mediterranean colour concept. Completion: 2011
Show more >> – – – – – – – – – – – – – – – – – –
PlusEnergy houses in Berlin-Adlershof
Size: 128 CU . Plot: Hectare
12489 Berlin-Adlershof: Climate-neutral home for 128 tenants in KfW 55 efficiency house. Gross floor area: 11,170 m2. Planning: Deimel Oelschläger Architekten. Completion: 2017
Show more >> – – – – – – – – – – – – – – – – – –
Garden City Falkenberg
Size: 128 CU . Plot: 4.4 hectare12524 Berlin: Bruno Taut's "Tuschkastensiedlung". 128 apartments in 48 storey apartments in six apartment buildings and 80 single-family houses in rows or as semi-detached houses with 1 to 5 rooms; gross floor area: 14,051 m². Restoration / renovation / extension: 1992 to 2002; since 2001 extension and since 2011 new construction of multi-family houses and terraced houses. Construction: 1913 to 1916
Show more >> – – – – – – – – – – – – – – – – – –
Model project housing plus electric car fleet
Size: 125 CU . Plot: Hectare70191 Stuttgart: in the Rosensteinviertel, the first larger housing estate (125 WEs) with electric cars in the car-sharing fleet was built as a model project. Completion: 2016
Show more >> – – – – – – – – – – – – – – – – – –
Eco-settlement "Hoher Weg" in Hamm
Size: 120 CU . Plot: 3 hectare59075 Hamm: In the ecological building area "Hoher Weg" in Hamm-Heessen, 120 residential units were built on an area of approx. 3 ha in the 1990s. To date (as of 12/2017), it is the second largest timber housing estate in Germany and in NRW. Together with the timber housing estate "Heinrichstraße" in Hamm, it was the first major housing development in Hamm to be planned from the outset with primarily ecological aspects in mind and thus had a model function for the ecological orientation of future building areas in the Hamm urban area.
Show more >> – – – – – – – – – – – – – – – – – –
Quartier WIR in Berlin Weißensee
Size: 113 CU . Plot: 0.7 hectare13088 Berlin: In the WIR quarter, a total of around 12,400 sqm of floor space was created with 207 flats as cooperative rental flats (BeGeno16) and as condominiums (UTB Projektmanagement GmbH), as well as 9 commercial units and common rooms (BeGeno16). Completion: 2020
Show more >> – – – – – – – – – – – – – – – – – –
Building Biology Settlement "Schafbrühl
Size: 111 CU . Plot: Hectare72074 Tübingen: with 111 apartments, it is the first large ecological settlement in Germany, GFZ 0.9, open space design according to H. Kügelhaus, building biology, wooden ceilings, natural food shop, naturopathy practice, social housing, planning team: Eble, Sambeth, Oed, Häfele, the first large ecological settlement in Europe. Since 2018, the pioneer settlement is a listed building. Completion: 1985
Show more >> – – – – – – – – – – – – – – – – – –
ExpoSiedlung Flintenbreite
Size: 111 CU . Plot: Hectare23554 Lübeck: Sewage-free model settlement; expoproject, 111 dwelling units. Completion 1st BA: 2000; 5th and last BA: 2015
Show more >> – – – – – – – – – – – – – – – – – –
Rainbow Settlement
Size: 111 CU . Plot: Hectare30629 Hanover-Miesburg: "Regenbogensiedlung", 111 social housing units, GFZ 0.88. 9,000 m² living space. Occupation 1996. 900 Euro/m². Architect: Schmitz, Aachen, developer Gundlach, Philipp Holzmann AG - CHP, low-energy construction, extensively greened roof - pergola development
Show more >> – – – – – – – – – – – – – – – – – –
Expo settlement "Sonnenfeld
Size: 110 CU . Plot: Hectare89073 Ulm: Passive house development with various developers and architects, including Joachim Eble, LEG, Siedlungswerk Stuttgart, 110 units, row and double passive house types with primary energy values between 60 and 110 kWh (per sqm and year). Completion: 2000
Show more >> – – – – – – – – – – – – – – – – – –
Allmende Wulfsdorf
Size: 110 CU . Plot: 6.4 hectares22926 AhrensburgSite area: 6.4 ha; 15 houses with 1 - 14 flats with high ecological standard (110 flats); 40% of the built-up area used for commercial purposes. Largest residential project with living and working in Schleswig-Holstein. Completion: 2012
Show more >> – – – – – – – – – – – – – – – – – –
Solar residential complex "Helios
Size: 108 CU . Plot: Hectare18055 Rostock: 108 apartments in 11 buildings. Apartment sizes between 44 and 93 m². Location: Brinckmanshöhe residential park. Completion: 2000
Show more >> – – – – – – – – – – – – – – – – – –
Aletsch-Campus in Naters
Size: 108 CU . Plot: HectareCH – 3904 Naters: Das Informations- und Besucherzentrum des UNESCO-Welterbes besteht aus 15 Gewerbe- und 15 Nutzeinheiten, sowie 78 Wohnungen in Holzmischbauweise im Minergie-Baustandard. Fertigstellung: 2015
Show more >> – – – – – – – – – – – – – – – – – –
IBA Block 6
Size: 106 CU . Plot: Hectare10963 Berlin-Kreuzberg: "International Building Exhibition", 106 WEs, completion 1987 / optimization and redesign 2006, grey water recycling plant for 250 tenants, saving 3 million litres of fresh water annually.
Show more >> – – – – – – – – – – – – – – – – – –
"Solarcity" Hanover Kronsberg
Size: 106 CU . Plot: Hectare30539 Hanover-Kronsberg: Sub-project of the Expo 2000 new housing development. 106 apartments with large solar collectors on the roofs, as well as solar local heating with seasonal storage. It is located in the southeastern part of the district. Completion: 2000
Show more >> – – – – – – – – – – – – – – – – – –
Hundertwasser House "Waldspirale
Size: 105 CU . Plot: Hectare64289 Darmstadt: Forest spiral, design by Friedensreich Hundertwasser. Model project for the use of recycled concrete.
"Green roofs are the roof coverings of the future. [...] It will be hard to imagine that there was a time when roofs were dead - without life and without vegetation."
Friedensreich Hundertwasser in: Stifter, Roland (1988): Roof gardens: green islands in the city. Stuttgart
Show more >> – – – – – – – – – – – – – – – – – –
IBA Block 103
Size: 103 CU . Plot: Hectare10963 Berlin-Kreuzberg: International Building Exhibition Berlin "Block 103". Redevelopment: 1991
Show more >> – – – – – – – – – – – – – – – – – –
"Living on the Steinweg"
Size: 101 CU . Plot: Hectare76297 Stutensee: Ecological housing estate, architect: Karl-Heinz Mayer. 101 dwelling units, completion: 1996-2000
Show more >> – – – – – – – – – – – – – – – – – –
Solar housing estate at the Medienhafen
Size: 101 CU . Plot: Hectare40219 Düsseldorf: Solar housing estate at the Medienhafen. 101 units, completion: 2009
Show more >> – – – – – – – – – – – – – – – – – –
DEUS21
Size: 100 CU . Plot: Hectare75438 Knittlingen (near Pforzheim): 100 houses. Collection of the black water via vacuum toilets (5 - 10 times less water content per flushing process) and the shredded kitchen waste (organic waste bin not applicable), which is then converted into biogas. The waste water is treated and is available again as germ-free care water that meets the requirements of the drinking water ordinance. DEUS 21 was awarded the Joseph von Fraunhofer Prize in 2007. The plant has been in operation since around 2004 and is a project of the Fraunhofer Institute IGB, Stuttgart and the FhG ISI Institute for Systems and Innovation Research, Karlsruhe.
Show more >> – – – – – – – – – – – – – – – – – –
IGA building exhibition Stuttgart
Size: 100 CU . Plot: Hectare70191 Stuttgart: Building exhibition "Wohnen 2000" for the IGA Federal Garden Show 1994, 100 units, Syszkowic & Kowalski, HSS, LogID, Mecanoo, Tegnestue Vandkunsten and other architects, completion: 1993
Show more >> – – – – – – – – – – – – – – – – – –
Tempelhof Palace with Earthship
Size: 100 CU . Plot: 30 hectaresD - 74594 Kreßberg: "Schloss Tempelhof" is a grassroots community that has existed in northern Baden-Württemberg since 2010. Almost 150 residents live on the 30-hectare village site. The ecovillage community is expected to grow to 300 residents. The community practices solidarity agriculture according to permaculture principles. There are jobs in a market garden, animal husbandry, cheese dairy, beekeeping, bakery and in the kitchen. Others have been created in the seminar business, the building sector, the administration and in the Free Montessori School.
Show more >> – – – – – – – – – – – – – – – – – –
Living at the Dantebad
Size: 100 CU . Plot: Hectare80637 Munich: 100 residential units plus common rooms in 4-storey timber system construction above a public car park. Architect: Florian Nagler, Client: GEWOFAG. Completion: early 2017
Show more >> – – – – – – – – – – – – – – – – – –
Building and housing cooperative "Kraftwerk1" in Zurich
Size: 100 CU . Plot: 0.67 hectareCH - 8005 Zurich: 100 apartments in 4 buildings with a total floor space of 11866 m². Infrastructure in the neighbourhood: restaurant, hairdresser, flower and fruit shop, a consumer depot with organic vegetables (opening hours in the off-peak hours), the "Pantoffelbar" with drinks around the clock, a guest room and a large common room with kitchen on the roof. The "Hardturm Settlement" as it is called by the "Kraftwerk 1" building and housing cooperative, which according to common definition would be called a quarter due to the building density and the mix of uses, is located in the Zurich West district. Completion: Completion: 2001
Show more >> – – – – – – – – – – – – – – – – – –
Bike City" residential development in Vienna
Size: 99 CU . Plot: HectareAT - 1020 Vienna: 99 apartments, gross floor area 14,500 m2, initiated by Christoph Chorherr, developed by GESIBA, architecture: königlarch, open space planning: rajek barosch landschaftsarchitektur. Completion: 2008
Show more >> – – – – – – – – – – – – – – – – – –
Wohnungsbaugenossenschaft "Am Ostseeplatz" e.G. in Berlin
Size: 98 CU . Plot: 0.4 hectare13353 Berlin: Multi-family building in three structures with 98 partly cluster/apartments and 4 commercial units, a total of 6,600 square metres of usable space. Completion: 2018
Show more >> – – – – – – – – – – – – – – – – – –
Future quarter "Schophoven
Size: WE . Plot: HectareD - 52459 Schophoven: in Schophoven, on the probable shore edge of the Indesee, a prototypical quarter will be created to serve as a model settlement. Here, work is being done on a structural realisation of the quarter and a transferability of the planning principles to other locations in the Rhenish mining area. Completion: ~2025
Show more >> – – – – – – – – – – – – – – – – – –