With the successful implementation of the state program "Area-wide Safety Charging Network for Electric Vehicles" (SAFE), Baden-Württemberg is the first state to have an area-wide charging network for electric cars in a 10-kilometer grid. The SAFE charging network consists of more than 450 charging stations.
While the construction of public charging infrastructure for electric cars is still being discussed elsewhere, Baden-Württemberg has built up a comprehensive charging network in recent months. A reliable charging infrastructure with more than 450 charging points now covers the entire state in a 10-kilometre grid. A consortium of 77 municipal utilities and suppliers as well as three municipalities had joined forces under the leadership of EnBW and successfully implemented the state programme "Area-wide Safety Charging Network for Electric Vehicles" (SAFE). The final event was held today (04.11.2019) in Stuttgart to take stock.
Electromobility is not only suitable for the big city!
"I am extremely pleased that we have taken electric mobility in Baden-Württemberg an important step forward with the SAFE project. Because with the nationwide expansion of the charging infrastructure, we are showing: Electromobility is not only suitable for the big city! I was able to see this for myself during my charging stop in Bad Urach today. SAFE, which was realised within the framework of Baden-Württemberg's strategy dialogue on the automotive industry, thus illustrates that electric mobility in the state is not only a clean and efficient, but also a reliable form of mobility," said Minister President Kretschmann. A consortium led by EnBW had been awarded the contract for the project in May 2018. "The parties involved have managed to set up a nationwide network of charging stations in one and a half years. I would like to thank EnBW as the project leader and its many project partners for this remarkable achievement. Together we are showing that we are pushing ahead: We are stepping on the gas and advancing electromobility in Baden-Württemberg step by step," Kretschmann continued.
Transport Minister Winfried Hermann explained: "E-charging must be as safe as it is simple. Above all, the charging points must work. With the nationwide SAFE charging network, we are creating the basis for the electrification of passenger car traffic in cities and rural areas. In this way, we are facilitating the switch to climate-friendly e-mobility."
81 Partner on behalf of the State of Baden-Württemberg
The SAFE charging network consists of more than 450 charging stations and will be operated by the project partners for at least six years. More than 250 already existing normal charging stations and more than 60 fast charging stations could be included in the network. But the consortium also built around 40 new fast charging stations and 88 normal charging stations. In addition, twelve existing charging stations were upgraded.
"This is how the mobility revolution must be managed," says EnBW CEO Dr. Frank Mastiaux, summing up the cooperation in the project. "With clout and teamwork, 81 partners have built up a powerful and reliable charging network within just 18 months. Complex infrastructure projects not only need a reliable framework, but also a planned and coordinated interaction between different players. SAFE is an example of how this can be achieved: through a high level of prioritisation by each project partner on site, as well as with the state of Baden-Württemberg as the key driver and funding provider."
The central requirement of the SAFE programme was: In a grid of ten by ten kilometres, there is at least one charging station with 22 kilowatts of power. In a second grid of 20 by 20 kilometres, there is also at least one fast charging station with 50 kilowatts of power. SAFE thus provides an area-wide charging network for drivers of electric cars: On average, there is a charging station every ten kilometres throughout the province - even in rural areas. All e-car drivers have easy access to the SAFE charging stations via the connected electromobility providers.
Starting signal for the further expansion of the charging infrastructure
SAFE has laid another foundation stone for the expansion of the charging infrastructure in Baden-Württemberg. In order to drive this forward, the Charging Infrastructure Network BW will bundle the exchange in the state even more strongly. Current challenges will be discussed and solutions developed via this open platform. The state agency for new mobility solutions and automotive Baden-Württemberg e-mobil BW GmbH is coordinating the new network, in which the experiences and findings of SAFE will be taken up and continued. In addition to its own commitment to the rapid expansion of charging infrastructure, EnBW will also remain closely associated with the new network as a partner. The state of Baden-Württemberg is thus directly taking the next step to prepare the charging infrastructure in the southwest of the republic for the ramp-up of e-cars. To this end, it had also launched the Charge@BW funding programme for non-public charging points launched.
On the SAFE website you will also find a Map overview of all SAFE charging stations between Wertheim in the north and Constance in the south, and Kehl in the west and Giengen an der Brenz in the east of Baden-Württemberg.
The Ministry of the Environment in Rhineland-Palatinate has launched the funding programme "1,000 efficient stoves for Rhineland-Palatinate". Within the framework of this programme, the replacement of old fireplaces with modern wood-burning systems is financially supported if they were approved between 1 January 1985 and 1 January 1995. The subsidy amounts to up to 800 €. The subsidy programme is intended to help accelerate the dismantling of old appliances in accordance with the 2nd stage of the 1st BImSchV and to further improve air quality. A total of 500,000 euros is available. This measure covers all old single-room furnaces such as wood-burning stoves, heating and tiled stove inserts from the above-mentioned period that are fired with solid fuels such as logs, wood or lignite briquettes. In addition, the replacement of old oil stoves is also promoted if they are replaced by a modern wood-burning stove.
Isabella Marboe (ed.) Bauen für die Gemeinschaft in Wien Neue gemeinschaftliche Formen des Zusammenlebens. Edition Detail 2021, 144 pages, de/eng, Euro 39.90
Review by Roman Schaurhofer, Vienna
Overview
The book "Building for the Community in Vienna" was published in 2021 by Isabella Marboe at Verlag Detail. All texts were printed in German and English in the book. In addition to an interview conducted by Marboe with Ulrike Schartner and Alexander Hagner, Robert Temel has his say in an expert article.
All in all, the book deals with 20 building projects in the Austrian capital Vienna and offers insight into the respective planning as well as the organisational and structural realisation of those very communities.
Content
At the beginning, Isabella Marboe looks back at historically relevant and significant events surrounding Viennese housing, community in everyday life and housing, and participatory building. The editor then highlights the importance and significance of the architect Ottokar Uhl and his work. Especially the projects "Living with Children" and "B.R.O.T." are mentioned and described as positive examples. In addition, Marboe goes into more detail about the historical developments surrounding the "Sargfabrik" and "MISS Sargfabrik" projects. Isabella Marboe is committed to a communal and socially solidary as well as responsible coexistence.
In Robert Temel's contribution, after a historical classification of Austrian pioneer and follow-up projects, there is also a brief description of organisational and ownership models. This is followed by an outline of the emergence of building communities and their possibilities for acquiring a building plot, as well as a comparison of several models implemented in Vienna.
In an interview, Ulrike Schartner and Alexander Hagner from gaupenraub+/- explained the many challenges that arise when creating quality housing for homeless people and at the same time show approaches to dealing with problems of this kind.
After the essays and the interview, there is a more detailed examination of the individual projects. A brief description, accompanied by key figures and background information, provides insights into the planning and implementation of the respective community ideas. In addition, illustrations and detailed plans (often in the form of floor plans) give the reader a better understanding of the structure and function of the respective project. In addition to individual buildings, row houses, multi-storey residential buildings and neighbourhood houses that stand out from their surroundings were also selected.
Criticism
The social and socially solidary approach of the project examples stands out in a clearly positive way. Each of the projects features people-oriented planning and high-quality implementation geared to the wishes of the residents, without losing sight of the demand for high-quality architecture. Although the communal and participatory character is clearly in the foreground as a unifying element, the individual projects cannot be denied their uniqueness and individuality in approach.
The detailed information, underpinned by pictorial representations, enables the reader to place the projects conceptually and contextually in their respective environment. With the overview and detailed descriptions of the sample projects, the editor Isabella Marboe offers a solid basis with carefully researched project examples for professional discourse and a more intensive examination of the topic of building communities.
February 2021, Hardcover, 23 x 30 cm, German / English
As the news agency Reuters reported last week, key targets in the draft Climate Action Plan 2050 drawn up by Federal Environment Minister Barbara Hendriks have been cancelled by Federal Economics Minister Sigmar Gabriel. According to Reuters, all greenhouse gas targets for 2030 in the energy, industry, transport and agriculture sectors have been cancelled, as has the sentence stating that the expansion of renewables must be accelerated. The wording for a deadline for phasing out coal "well before 2050" has also been removed.
The draft is now to be agreed with Transport Minister Dobrindt (CSU) and Agriculture Minister Schmidt (also CSU) before the cabinet is allowed to vote on the remainder in September.
We use cookies to optimize our website and services.
Functional
Always active
Technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a particular service explicitly requested by the subscriber or user or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that have not been requested by the subscriber or user.
Statistics
The technical storage or access, which is solely for statistical purposes.Technical storage or access used solely for anonymous statistical purposes. Without a subpoena, voluntary consent from your Internet service provider, or additional records from third parties, information stored or accessed for this purpose cannot generally be used alone to identify you.
Marketing
Technical storage or access is necessary to create user profiles, to send advertising or to track the user on a website or across multiple websites for similar marketing purposes.