Web database of sustainable settlements and neighbourhoods

Scharnhauser Park

05573760 Ostfildern: Former barracks site. The settlement is designed for 8,000 inhabitants and 2,000 jobs, on 140 hectares. The connecting link and landmark is the "landscape staircase", which is a good kilometre long and 30 metres wide and slopes gently down to the south. The development of energy-efficient buildings and the use of regenerative energies was financially supported with funds from the EU research project POLYCITY (funding period 2005-2010). The complete investment volume of the project with a floor area of 480,700 m² amounts to 1.5 billion euros. German Urban Development Award 2006.
The energy supply is provided by a biomass block-type thermal power station (1 MWel and 6.3 MWth), solar collector systems with an area of 200 m² and photovoltaic systems integrated into buildings with a capacity of 70 kW.

Photo gallery 2008


View all 49 photos >>

Publication
Michael Koch: "Ecological Urban Development". Kohlhammer Publishing House. Stuttgart 2001

Links
www.ostfildern.de/scharnhauser_park.html
www.db-bauzeitung.de/allgemein/gebuendelte-kraefte (2005)



Last Updated: February 18, 2021

Similar projects on sdg21:
All project/s of the planning office: Ramboll Studio Dreiseitl; Urban region: Stuttgart and surrounding area; Country: Germany; Characteristics: 01 - 02 Floors, 03 - 4 floors, 05 - 6 floors, 07-10-storey, Single-family house, Multi-storey housing, Rental apartments, Terraced house; typology: Settlement; Thematic: Barracks conversion

en_GB