Web database of sustainable settlements and neighbourhoods

XL

500 - 999 WE

Displayed are: 22 projects

    Platensiedlung in Frankfurt-Ginnheim

    Size: 992 CU . Plot: Hectare

    D - Frankfurt a.M. Ginnheim: The 342 existing apartments in the 19 three-storey row buildings will be renovated to improve energy efficiency (insulation and new windows) and two storeys will be added. A total of around 680 new, mainly smaller apartments are being created. 300 apartments are being built in 15 new buildings in so-called gate and bridge houses. Architecture: Stefan Forster (Frankfurt). Construction began in 2017. Completion of the storeys: End of 2019. Completion of the new buildings (post-densification): 2023.



    Show more >>
    – – – – – – – – – – – – – – – – – –

    Settlement model St. Leonhard

    Size: 900 CU . Plot: Hectare

    90439 Nuremberg: The Nuremberg slaughterhouse was closed in 1995. On the 8.7 hectare site near the old town, a new urban quarter with 900 apartments, offices, community facilities and a district park was to be built. Three historical buildings were to be converted into a kindergarten, a district centre and a children's cultural centre. In the course of planning, the building density was significantly reduced. Completion: 2005(?)



    Show more >>
    – – – – – – – – – – – – – – – – – –

    Creative quarter in timber construction for Munich

    Size: 900 CU . Plot: 20 hectares

    D - 80335 Munich: on the site of the former Luitpold barracks and adjacent areas, a total of around 900 apartments and spaces for 770 workplaces are to be built in a new mixed-use urban quarter. According to a decision on 20.5.2020 in the planning committee of the city of Münchner, 370 residential units are to be built in the "creative field", a part of the creative quarter, in timber construction. The urban quarter between Dachauer-, Loth-, Schwere-Reiter-, Heß- and Infanteriestraße will combine living and working with art, culture and knowledge. Twelve building quarters and a mixed-use area are to be created. Tenders for building cooperatives and developers are to start soon on the "Kreativfeld" (as of 4 June 2020). Completion (1.BA Kreativfeld): ~2024



    Show more >>
    – – – – – – – – – – – – – – – – – –

    Mannheim-Wallstadt-North

    Size: 850 CU . Plot: 26 hectares

    68259 Mannheim-Wallstadt-North: 26 hectares, 850 residential units. The primary goal was to create a settlement area that fulfils the elementary human desire for a stylish, natural living culture. This goal is achieved through an environmental concept that includes, for example, green spaces, wetland biotopes and ponds.



    Show more >>
    – – – – – – – – – – – – – – – – – –

    Neckarpark" urban district in Stuttgart

    Size: 850 CU . Plot: 22 hectares

    70372 Stuttgart: Europe's largest wastewater heat utilisation plant will in future supply the new residential and commercial area with 850 residential units, commercial areas, parks, squares and streets on a total of 22 hectares and is thus a beacon project for renewable energies. The sewer will provide local heating and cooling via a 300 m long heat exchanger. The system has been installed since 2018 and will be put into operation as soon as the heating centre is also in full operation. The quarter is still under construction. Planned completion of the quarter: 2021



    Show more >>
    – – – – – – – – – – – – – – – – – –

    Jenfeld floodplain

    Size: 835 CU . Plot: 35 hectare

    22045 Hamburg-JenfeldHAMBURG WATER Cycle®, an urban quarter with 835 residential units, 630 of them in new buildings, and commercial space for around 2000 residents is being built on 35 ha of the former Lettow-Vorbeck barracks. Project costs: approx. 250 million euros. The most far-reaching project of a decentralised water supply and disposal system currently in Europe: vacuum toilets, biogas production and waste water separation (HAMBURG WATER Cycle®). The biogas produced will be used to generate heat and electricity for the new district in a climate-neutral manner in the district's own combined heat and power plant. The project will thus enable climate-neutral living and sustainable drainage.



    Show more >>
    – – – – – – – – – – – – – – – – – –

    Car-free district "An der Panke

    Size: 760 CU . Plot: Hectare

    model14109 Berlin: Car-free district on the Panke. Urban master plan. Not realized!



    Show more >>
    – – – – – – – – – – – – – – – – – –

    Petrisberg Trier

    Size: 750 CU . Plot: Hectare

    DSC_309554296 Trier: Total area approx. 70 ha, residential area: approx. 25 ha, Science Park and University of Trier mainly in the area of the former barracks: approx. 23 ha, green and open spaces: approx. 20 ha. Private investment in residential construction approx. 200 million euros and approx. 150 million euros in commercial construction. Approx. 850 residential units*, completion: 2015



    Show more >>
    – – – – – – – – – – – – – – – – – –

    Low-energy house district Darmstadt-Kranichstein

    Size: 700 CU . Plot: Hectare

    64289 Darmstadt-Kranichstein: Low-energy house district with partly more extensive ecological measures; various architects including Thomas Herzog. Completion: 1991



    Show more >>
    – – – – – – – – – – – – – – – – – –

    Bioenergy Village Wolpertshausen

    Size: 700 CU . Plot: Hectare

    aerial view74549 Wolpertshausen: Bioenergy village with eco-settlement. 1,800 P.E. Approx 50% renewable energy. „Ecological residential area Wolpertshausen"is completely supplied by local heating or by a biogas community plant (commissioning: 1996).



    Show more >>
    – – – – – – – – – – – – – – – – – –

    Stegerwaldsiedlung, Cologne

    Size: 689 CU . Plot: Hectare

    Photo: EnergyAgency.NRW51063 Cologne-Mülheim: The state of North Rhine-Westphalia has named the Stegerwaldsiedlung in the Cologne district of Mülheim as the 87th climate protection estate. With 968 kWp, it has the largest roof-integrated PV system on a housing estate in NRW and the third largest in Germany. 689 residential units of the Cologne housing estate from the 1950s were refurbished for energy efficiency and the energy generation systems were renewed. Completion: 2019



    Show more >>
    – – – – – – – – – – – – – – – – – –

    Thomas-Müntzer-Siedlung

    Size: 665 CU . Plot: Hectare

    04249 Leipzig-Knauthain: 665 WE, urban planning: Joachim Eble Architektur, decentralized settlement units; solar orientation (90% of the WE are SSW or SSO oriented) and integrated into the open space concept of so-called landscape chambers; resource-saving use of building land with minimized development effort in the area of residential development; ecological land use with high nature and open space quality on the compensation areas close to the settlement.



    Show more >>
    – – – – – – – – – – – – – – – – – –

    Westend Berlin-Charlottenburg

    Size: 665 CU . Plot: Hectare

    Westend Berlin-CharlottenburgIn-Entstehung_gr100px_200dpiD - 14055 Berlin-Charlottenburg: 665 units as a new housing estate with two-, three- and four-room apartments. Furthermore, single-family homes, shops, medical practices and a daycare center. Mixture of rental and owner-occupied apartments.

    On 3/14/2018, after 5 years of negotiations, the contract was signed. The company expects construction to start at the end of 2019, and the last construction phase could be completed in 2025.

    Low-energy house standard, CHP, photovoltaic system, sustainable mobility concept with bicycle parking in front of the front doors and e-bikes, electric cars in the car-sharing fleet. Quarter with Cradle to Cradle certification and healthy building materials, green roof.



    Show more >>
    – – – – – – – – – – – – – – – – – –

    Ermekeilkarree Bonn

    Size: 643 CU . Plot: Hectare

    DSC_0002In-Entstehung_gr100px_200dpiD - 53115 Bonn: in Bonn's Südstadt, surrounded by residential buildingsThe historic buildings of the former Ermekeil barracks are located in the centre of the town, along with shops, cafés and restaurants. Größe: 2 ½ Hektar Grundstücksfläche, 643 Wohneinheiten in unterschiedlichen Wohnformen (Entwurf des Büros Reicher Haase aus Dortmund). Im Entwurf sind Wohnprojekte, Baugemeinschaften und Wohngemeinschaften vorgesehen. Die Gebäudestruktur und Platzfolge im Quartier erinnert ein wenig an Florenz. Baubeginn: evtl. 2026?



    Show more >>
    – – – – – – – – – – – – – – – – – –

    Exhibition grounds Oederan

    Size: 622 CU . Plot: Hectare

    09111 Oederan Chemnitz: 622 RESIDENTIAL UNITS. Model project for the Chemnitz technology and business park solaris, as well as the Stadtbau- und Wohnungsverwaltungsgesellschaft. 17 blocks of flats were renovated, 7 of them were equipped with 100 sqm collector surface each. Year of construction: 2000



    Show more >>
    – – – – – – – – – – – – – – – – – –

    GWL-Terrein Amsterdam-Westerpark

    Size: 600 CU . Plot: Hectare

    NL - Amsterdam-Westerpark: with 600 apartments for 1400 inhabitants on 6 hectares, the GWL-Terrein is the largest contiguous car-free housing estate in Europe. Number of parking spaces: 0.2. Completion: 1998



    Show more >>
    – – – – – – – – – – – – – – – – – –

    Solar City Wiggenhausen

    Size: 570 CU . Plot: Hectare

    3 Collector view88045 Friedrichshafen: 570 apartments, 40,000 sqm living space, 4.2 million euros for solar technology = 5,500 euros additional investment per apartment = 83 euros/sqm living space, research project of ITW, Stuttgart, solar coverage ratio is of 50 % (heating and hot water), 4,056 sqm solar collectors, 12,000 cubic meters storage (33 m diameter, 20 m high)



    Show more >>
    – – – – – – – – – – – – – – – – – –

    Wooden housing estate in Prinz Eugen Park

    Size: 566 CU . Plot: 10 hectare

    81927 Munich: Germany's largest contiguous timber housing estate with 566 apartments in timber or timber hybrid construction has been built in the Oberföhring district. Different building types up to 7-storey houses were built in timber construction. The approx. 30-hectare site of the former Prinz Eugen barracks is located in district 13 - Bogenhausen. The apartments were realized by building communities, cooperatives, municipal and independent developers, allowing a wide range of offers for a wide variety of housing needs: for rent and ownership, in different building types, for all household sizes and income groups and alternative forms of housing. Completion: 2020



    Show more >>
    – – – – – – – – – – – – – – – – – –

    Lok.West" neighbourhood with power-to-gas technology in Esslingen

    Size: 550 CU . Plot: 2.6 hectare

    In-Entstehung_gr100px_200dpi73728 Esslingen Neue Weststadt: A "showcase quarter" with 600 apartments, office and commercial space as well as a new building for the Esslingen University of Applied Sciences is being built on 12 hectares. The total investment volume is around 190 million euros. 30 percent of the quarter's use is intended for commercial purposes. Construction of individual building blocks already started in 2016 and will continue until around 2022. Planned completion: 2022



    Show more >>
    – – – – – – – – – – – – – – – – – –

    Energy Plus Quarter Vellmar North

    Size: 550 CU . Plot: 16 hectares

    D - 34246 Vellmar-Nord: The urban design, with around 550 residential units on a 16-hectare site, envisages a mix of detached single houses and houses in a more compact design using semi-detached and terraced houses and multi-storey housing. In terms of size, it will be one of the largest plus-energy housing estates in Germany. The plus-energy concept takes into account heat, electricity and mobility. Start of construction: from April 2020. Completion: ~2024



    Show more >>
    – – – – – – – – – – – – – – – – – –

    Climate and timber construction quarter "Ellener Hof

    Size: 500 CU . Plot: 9 hectares


    D - 28329 Bremen-Osterholz: At least 500 apartments are planned, which will offer a new home to around 1,000 Bremen residents of all ages and from different social classes and cultures. In close cooperation with the Free Hanseatic City of Bremen, the Bremer Heimstiftung, as the owner of the site, is therefore not only working on new living space. Social institutions, clubs and cultural institutions will also enrich the "Ellener Hof Foundation Village" in the future. In addition, the partners are focusing on attractive green spaces. The respectful treatment of the valuable stock of trees, bushes and vegetation on the property is the basis and an integral part of all planning. Construction began on 7.9.2018. Planned completion: 2025(?)



    Show more >>
    – – – – – – – – – – – – – – – – – –

    ecovillage Hanover

    Size: 500 CU . Plot: 4.9 hectare

    D - 30539 Hanover Kronsberg: adjacent to the Expo-Settlement Hanover-Kronsberg soll das „ecovillage Kronsberg“ entstehen. Träger ist die Genossenschaft ecovillage hannover eG, die 2019 gegründet wurde. Die Genossenschaft hat das 49.300 m² große Grundstück 2021 von der Stadt Hannover gekauft. Ab 5/2024 befindet sich die Genossenschaft in einem Insolvenzverfahren in Eigenverwaltung. Fertigstellung: ?



    Show more >>
    – – – – – – – – – – – – – – – – – –

en_GB