from 1.000 WE
Munich Freiham
Size: 8000 CU . Plot: 350 hectareD - 81249 Munich-Freiham: on 350 ha with residential space for 20,000 and commercial space for 7,500 people. The goal is sustainable urban development that meets economic, ecological and social requirements in equal measure. The first residents should be able to move into their new apartments from the beginning of 2018. The new district is being built in several phases. The apartments are 50 percent privately financed, 30 percent socially subsidized and 20 percent allocated according to the "Munich Model".
Show more >> – – – – – – – – – – – – – – – – – –
Rosenstein Quarter
Size: 7500 CU . Plot: 85 hectareD - 70191 Stuttgart: the city of Stuttgart assumes 7,500 apartments (for 11,000 inhabitants) and 4,000 jobs (as of 2015) on 85 ha. Start: 2026 at the earliest; completion: ~2032
Show more >> – – – – – – – – – – – – – – – – – –
Climate-neutral new housing estate Freiburg Dietenbach
Size: 6900 CU . Plot: 110 hectaresD - 79111 Freiburg-Dietenbach: one of the largest new development areas in Germany is being built on 110 hectares for 6,900 apartments. The intention is to create living space for 15,000 residents. Six new neighborhoods are to be developed in Freiburg's west along the Dietenbach as a climate-neutral and colorful district with short distances, open spaces, schools, sports facilities, daycare centers and shopping opportunities. It should be possible to move into the first apartments around 2025/2026. Completion: ~2035
Show more >> – – – – – – – – – – – – – – – – – –
Munich-Riem Trade Fair City
Size: 6500 CU . Plot: 556 hectares81829 Munich: New development area on the site of the former Riem Airport on a planning area of 556 ha. There are plans for 6,500 apartments for 15,000 residents, mainly in multi-storey housing, and jobs for 13,000 employees. In 2014, there were more than 12,000 residents. Developing the district sustainably was a central theme of Messestadt Riem. Several evaluations of Messestadt Riem took place. Completion: 2018
Show more >> – – – – – – – – – – – – – – – – – –
Car-free neighbourhood "Merwede" in Utrecht
Size: 6000 CU . Plot: 60 hectaresNewly built districts with space-efficient mobility offers
NL - 3526 KM Utrecht: On the west side of the Merwedekanal, a new sustainable urban district is being built in a central location not far from Utrecht's main railway station. The plan is to create a mixed-use district with 6,000 flats for approximately 12,000 residents. The area is to become a showcase for healthy and sustainable living with innovative concepts for recycling, energy production, climate adaptation and mobility solutions. Planned completion: by 2024
Show more >> – – – – – – – – – – – – – – – – – –
Schumacher-Quartier: 5000 residential units in timber construction in Tegel
Size: 5000 CU . Plot: 48 hectaresD - 13405 Berlin-Tegel: A climate-neutral urban quarter in timber construction with more than 5,000 apartments is to be built. This will make it the largest timber construction quarter in the world. In addition to the apartments, several schools, daycare centers, sports facilities, shopping opportunities and lots of greenery are also planned for the development area with 46 ha geplant. Eine starke Durchgrünung sorgt für eine klimaangepasste und wassersensible Stadtentwicklung und wirkt auch über das Quartier hinaus. Start Hochbau: voraussichtlich 2026. Geplante Fertigstellung: Mitte der 2030er Jahre
Show more >> – – – – – – – – – – – – – – – – – –
New development area Freiburg-Rieselfeld
Size: 4500 CU . Plot: 70 hectare79111 Freiburg-Rieselfeld: Ecological district development for 10,000 people. Completion: 2010
Show more >> – – – – – – – – – – – – – – – – – –
Niewland, Amersfoort
Size: 4500 CU . Plot: 170 hectareNL - Amersfoort: 4500 apartments for around 15,000 residents. 1 megawatt of solar power integrated into the roofs of the new district. One of the largest sustainable urban development projects in the Netherlands. Completion date: 2002
Show more >> – – – – – – – – – – – – – – – – – –
Quartier FRANKLIN in Mannheim
Size: 4100 CU . Plot: 94 hectaresD - 68309 Mannheim: On the former largest barracks site of the US Armed Forces in Germany, the so-called "Benjamin Franklin Village", five largely mixed-use neighbourhoods have been developed since 2012 on an area of 94 ha. Residential buildings for around 9,300 people (4100 units) and around 2,000 jobs are to be built. Furthermore, a park of 50 hectares will be realized. Existing buildings will be used, energetically renovated and modernized in line with the times, but also many new buildings will be constructed. December 2017 the first residents have moved in, in December 2019 already exceeded the 1000 residents. Completion: 2025
Show more >> – – – – – – – – – – – – – – – – – –
Heidelberg Railway City
Size: 3700 CU . Plot: 116 hectares69115 Heidelberg: Bahnstadt is the largest passive house development in the world and one of the largest new development areas in Germany with 116 ha. Electricity and heat are supplied entirely from renewable energies. 6,500 to 6,800 people will live in Bahnstadt in the future, and 5,000 to 6,000 people will work there. At the end of 2018, more than 4,000 people will live in Bahnstadt. Around 2,450 apartments have already been built - a total of around 3,700 apartments will be built.
Show more >> – – – – – – – – – – – – – – – – – –
Scharnhauser Park
Size: 3600 CU . Plot: 140 hectares73760 Ostfildern: Former barracks site. The settlement is designed for 8,000 inhabitants and 2,000 jobs, on 140 hectares. The connecting link and landmark is the "landscape staircase", which is a good kilometre long and 30 metres wide and slopes gently down to the south. The development of energy-efficient buildings and the use of regenerative energies was financially supported with funds from the EU research project POLYCITY (funding period 2005-2010). The complete investment volume of the project with a floor area of 480,700 m² amounts to 1.5 billion euros. German Urban Development Award 2006.
Show more >> – – – – – – – – – – – – – – – – – –
Hanover-Kronsberg
Size: 3200 CU . Plot: 60 hectares30539 Hanover-Kronsberg: Reduction of energy consumption through low-energy construction, electricity saving and the use of CHP units. As sub-projects, a passive house settlement (see "Settlement Lummerland") and a solar settlement with solar local heating and seasonal storage were realised. Intensive green space design. Rainwater is drained into the trough-filtration system. Completion: 2000
Show more >> – – – – – – – – – – – – – – – – – –
"Stad van de Zon", Heerhugowaard
Size: 2900 CU . Plot: 123 hectaresNL - Heerhugowaard: With 2,900 apartments on 123 ha of building land, the settlement is the largest sustainable settlement in the world. The total area with park and water areas covers 177 ha. The photovoltaic system on the roofs has a capacity of 3.75 MW. Another PV system with 1.25 MW, as well as three wind turbines on the site are the active components of the CO2-neutral energy supply. Car-free zone. Planning: Ashok Bhalotra of urban design bureau KuiperCompagnons, Rotterdam. Partner of the European Sun Cities project. Completion: 2016
Show more >> – – – – – – – – – – – – – – – – – –
Sustainable model district Vauban
Size: 2591 CU . Plot: 41 hectares79100 Freiburg-Vauban: extended citizen participation through the Forum Vauban, car-free living, public transport, car sharing, mixed use, solar garage, local heating with CHP units, nature-oriented open space design, building biology and ecological materials. 40% of households live without their own car. The number of parking spaces for the entire quarter is 0.42 PkW/WE. Large-scale completion: 2012
Show more >> – – – – – – – – – – – – – – – – – –
Patrick Henry Village (PHV) - IBA Heidelberg
Size: 2500 CU . Plot: 92.7 hectaresD - 69124 Heidelberg: Under the motto Knowledge creates the city the IBA Heidelberg will take place from 2012 to 2022. One of the key projects of the IBA and its largest urban development project of international significance is the Patrick Henry Village (PHV) where once 8,000 Americans lived. An urban development vision is currently being developed for the conversion project, which covers an area of 92.7 ha, under the leadership of urban planner Kees Christiaanse (KCAP) from Zurich. The preliminary city-wide plans envisage apartments for around 10,000 residents (approx. 4,200 residential units), as well as buildings with space for approx. 5,000 workplaces. Completion: ~2030
Show more >> – – – – – – – – – – – – – – – – – –
Building area "Hirtenwiesen II" with solar local heating in Crailsheim
Size: 2000 CU . Plot: 42 hectares74564 Crailsheim: 250 residential units and a school with sports hall (Hirtenwiesenhalle). Solar local heat supply for the base load heat of 2000 apartments with 7,410 m² collector surface, a 39,000 m³ geothermal probe heat storage, two buffer storage tanks (100 m³ + 480 m³) and a compression heat pump (80 kW). Completion: 2008
Show more >> – – – – – – – – – – – – – – – – – –
Kirschgärten timber housing estate in Munich
Size: 2000 CU . Plot: 12 Hektar80997 Munich-Untermenzing: A total of 1,300 flats in timber hybrid construction are to be built on the 12-hectare site. There will also be a three-form entry primary school, daycare centres, a neighbourhood square with a café and small local amenities as well as an extensive public green park. With 1,300 residential units in timber construction, it will be the largest timber housing estate in Bavaria and one of the top 5 in Europe. Completion: 2030
Show more >> – – – – – – – – – – – – – – – – – –
Horseshoe settlement
Size: 1963 WE . Plot: 29 hectares12359 Berlin-Britz: The Hufeisensiedlung is part of the large housing estate Britz with a total of 1963 apartments for about 5000 residents was built as one of the first social housing estates in Berlin. The architecture of the strongly green settlement proved to be trend-setting. The architects involved in the planning were Bruno Taut, the city building councilor Martin Wagner and the garden architect Leberecht Migge. As a complete ensemble, the estate has been a listed building since 1986. Since 2008 it has been a Unesco World Heritage Site and since 2010 it has also been registered as a garden monument. Completion: 1933
Show more >> – – – – – – – – – – – – – – – – – –
Würzburg Hubland
Size: 1800 CU . Plot: 95 hectaresD - 97074 Würzburg: CO2-neutral conversion area for 4,500 inhabitants (approx. 1,800 residential units) on 95 ha, approx. 5.7 ha for commercial uses. Seven individual quarters. In 2018, the state horticultural show will be held on the site. The development measure is to be completed by 2024.
Show more >> – – – – – – – – – – – – – – – – – –
IBA Wilhelmsburg
Size: 1733 CU . Plot: 30 hectares21109 Hamburg-Wilhelmsburg: The International Building Exhibition IBA Hamburg is one of the largest urban development projects in Europe. To date, 70 projects have been realised as part of IBA Hamburg. In 2013, IBA Hamburg had a total of 1,733 apartments under construction or completed, 516 of which were modernizations. Added to this are over 100,000 square metres of commercial space, eight educational facilities, two senior citizens' residential homes, three daycare centres, four sports facilities, a commercial courtyard, a centre for artists and creative people, the extension of the Aßmann Canal and over 70 hectares of green space.
Show more >> – – – – – – – – – – – – – – – – – –
Addition to Nordstadt Karlsruhe
Size: 1651 CU . Plot: Hectare76149 Karlsruhe: Conversion of the former U.S. housing estate. 526 units of the total of 1,651 units of this existing housing estate were built as storeys in timber frame construction in the low-energy standard. The additional storeys in timber construction alone are the largest coherent timber housing estate in Europe in the last 40 years. Completion: 2000
Show more >> – – – – – – – – – – – – – – – – – –
Röthelheimpark Erlangen
Size: 1512 CU . Plot: 130 hectares91052 Erlangen: On a former military site of the US Army, a district close to the city centre for approx. 5,000 residents is being developed on 136 ha. In addition to areas for Business and housing, the University of Nuremberg-Erlangen was expanded on this site. A district park linked to a nature reserve completes the mix of uses from living, working, learning and leisure. Completion: 2014
Show more >> – – – – – – – – – – – – – – – – – –
Neckarbogen Heilbronn
Size: 1400 CU . Plot: 30 hectares74076 Heilbronn: 22 houses are to be built and occupied in the first construction phase by 2019. The development is intended to form a compact, urban edge to the Federal Horticultural Show Heilbronn 2019. 19 renowned offices have designed the architecture for this. The usage concepts are diverse, and technical innovations are to be showcased. A four- to six-storey development is planned for the approximately 30-hectare site. Around 3,500 residents are expected to live here one day. The site is certified as a "DGNB Platinum" for urban quarters (2016 version).
Show more >> – – – – – – – – – – – – – – – – – –
Solar City Neckarsulm-Amorbach
Size: 1300 CU . Plot: Hectare74172 Neckarsulm-Amorbach: the largest solar local heating project to date with a 150,000 m3 -The storage capacity was 65,000 m³ in 1997 and 115,000 m³ in 2001. The entire new development area with a total of 4,000 residential units has been realised in low-energy construction and is supplied via various local heating islands and CHP units. 2004: a biomass heating plant was put into operation. A housing estate with 1,300 units and a school are supplied by a solar system with seasonal storage.
Show more >> – – – – – – – – – – – – – – – – – –
Västra Hamnen (BO01) Malmö
Size: 1300 CU . Plot: 30 hectaresSE - 211 17 Malmö: From 2001 onwards, the new district of Västra Hamnen (Westhafen) was built on an industrial wasteland of around 175 hectares, which is to be home to around 10-12,000 inhabitants. It was realized as a building exhibition with ambitious sustainability goals. A row of terraced houses was built as a "European settlement". Completion: 2005
Show more >> – – – – – – – – – – – – – – – – – –
Building groups in the Clouth quarter
Size: 1200 CU . Plot: 14.5 hectares50733 Cologne-Nippes: on the site of the former Clouth Gummiwerke with an area of 14.5 hectares, around 1,000 apartments will be built and space for 500 - 1,000 jobs will be created on approx. 25,000 m² of gross floor area.
Show more >> – – – – – – – – – – – – – – – – – –
Overseas island Bremen
Size: 1200 CU . Plot: 15 hectare
D - 28217 Bremen: With the development of the 15-hectare former Kelloggs factory site on the south side of the Europahafen, a new mixed urban quarter is to be created in Bremen in the immediate vicinity of the city centre and directly on the Weser. In addition to a variety of residential options, it will include office and commercial space, schools and daycare centers, recreational facilities and public spaces. Modern ecological mobility and energy concepts and sophisticated architecture determine the image of the quarter. Planned start of construction: 2021, planned completion: ~2031
Show more >> – – – – – – – – – – – – – – – – – –
Farmsen trotting course
Size: 1138 CU . Plot: 29.7 hectares22159 Hamburg-Farmsen: former harness racing track, water concept; example of how much ecology urban planning can demand; individual entrances in multi-storey residential buildings
Show more >> – – – – – – – – – – – – – – – – – –
French Quarter Tübingen
Size: 1100 CU . Plot: 9 hectares72072 Tübingen: District development in the French Quarter for 2,500 residents. Around 150 businesses with around 700 jobs have been established. Leisure, shopping and service facilities are planned in the quarter itself or are partly available in the immediate vicinity of the quarter. This is a conversion area with former barracks of the French Army; conversion of the massive barracks buildings, which are worth preserving, to multi-storey housing or redensification on vacant, cleared areas. Completion: 2012
Show more >> – – – – – – – – – – – – – – – – – –
WerkBundCity Berlin
Size: 1100 CU . Plot: 2.8 hectare12627 Berlin: (not realized). 33 architectural firms from Germany, the Netherlands and Switzerland, among others, presented the design of WerkBundStadt Berlin. The plan was to build 1,100 new apartments in 38 buildings on 2.8 hectares of land. A critique of it in the deutsche bauzeitung (db) recalls the historical heritage in which the project stands: "It is laudable that the Deutscher Werkbund is speaking out with a contribution. After all, it is precisely the Werkbund housing estates from Stuttgart to Breslau, Prague, Vienna and Zurich that stand for the experimental living worlds of modernism.
Show more >> – – – – – – – – – – – – – – – – – –
Five "Freiheit Emscher" construction sites
Size: WE . Plot: HectareD - Between Essen and Bottrop, a total of 1700 ha area 5 new development areas with a total area of 150 ha, along the Emscher, which no longer stinks of sewage:
https://freiheit-emscher.de/
Show more >> – – – – – – – – – – – – – – – – – –
icec - International Campus-Eco-City Wünsdorf
Size: WE . Plot: 100 HektarD - 15806 Wünsdorf:
Concept of an ecological model and future city for the 21st century. Since 2017, a team of pioneers of ecological urban planning around Prof. Dr. Ekhart Hahn has been developing a new Campus Eco-City to be built at the Wünsdorf site near Zossen (approx. 40 km from Berlin). The former "forbidden" town of Wünsdorf with a total area of 600 ha offers ideal conditions for the realisation of this vision, which is to be realised on approx. 100 ha. Completion: ~2030
Show more >> – – – – – – – – – – – – – – – – – –